If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274241002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.287141,"lon":-113.295499,"icon":""}]} |
Location: 00/02-10-027-24W4/0 | |
Location Alias: 00/02-10-27-24 W4M | |
Location Alias 2: 00/02-10-027-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 24 | |
Section: 10 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 2-10-27-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0427676 | |
License Date: 2010-12-14 | |
License Status: Issued | |
Spud Date: 2011-01-06 | |
Final Drill Date: 2011-01-16 | |
Well Total Depth: 875.30 m | |
Surface Hole Latitude: 51.287141 | |
Surface Hole Longitude: -113.295499 |
Date | Event |
---|---|
2010-12-14 | Obtained License |
2011-01-07 | Surface Casing Operation Performed |
2011-01-16 | Finished Drilling |
2011-01-16 | Well Mode changed to Drilled and Cased |
2011-01-17 | Production Casing Operation Performed |
2011-01-17 | Rig Released |
2011-01-20 | Well Log Performed |
2011-02-14 | Perforation Treatment Performed - Jet Perforation |
2011-03-10 | Perforation Treatment Performed - Fractured |
2011-03-13 | Well Fluid changed to Gas |
2011-03-13 | Well Mode changed to Testing |
2011-07-07 | Perforation Treatment Performed - Jet Perforation |
2011-07-19 | Perforation Treatment Performed - Fractured |
2011-07-29 | Well Began Production |
2011-07-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-07-29 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-14 | Perforation | 818.00 | 820.00 | 13 |
2011-07-07 | Perforation | 393.50 | 395.00 | 13 |
2011-07-07 | Perforation | 357.30 | 358.30 | 13 |
2011-07-07 | Perforation | 354.10 | 355.60 | 13 |
2011-07-07 | Perforation | 371.00 | 371.50 | 13 |
2011-07-07 | Perforation | 359.80 | 360.80 | 13 |
2011-07-07 | Perforation | 442.90 | 443.40 | 13 |
2011-07-07 | Perforation | 508.40 | 508.90 | 13 |
2011-07-07 | Perforation | 475.50 | 477.00 | 13 |
2011-07-07 | Perforation | 518.00 | 518.50 | 13 |
2011-07-07 | Perforation | 515.30 | 515.80 | 13 |
2011-02-14 | Perforation | 707.00 | 709.00 | 13 |
2011-07-07 | Perforation | 455.00 | 456.00 | 13 |
2011-07-07 | Perforation | 451.30 | 452.30 | 13 |
2011-07-07 | Perforation | 469.60 | 470.60 | 13 |
2011-07-07 | Perforation | 462.60 | 463.60 | 13 |
2011-07-07 | Perforation | 306.00 | 307.50 | 13 |
2011-07-07 | Perforation | 292.00 | 295.00 | 13 |
2011-07-07 | Perforation | 335.50 | 338.00 | 13 |
2011-07-07 | Perforation | 311.00 | 313.00 | 13 |
2011-07-07 | Perforation | 230.50 | 233.50 | 13 |
2011-07-07 | Perforation | 220.10 | 220.60 | 13 |
2011-02-14 | Perforation | 575.00 | 577.00 | 13 |
2011-07-07 | Perforation | 267.00 | 270.00 | 13 |
2011-07-07 | Perforation | 236.00 | 238.00 | 13 |
2011-07-07 | Perforation | 350.00 | 352.00 | 13 |
2011-07-07 | Perforation | 584.00 | 586.00 | 13 |
2011-07-07 | Perforation | 240.10 | 240.60 | 13 |
2011-07-07 | Perforation | 332.60 | 333.10 | 13 |
2011-07-07 | Perforation | 521.00 | 521.50 | 13 |
2011-07-07 | Perforation | 431.00 | 433.00 | 13 |
2011-07-07 | Perforation | 403.00 | 406.00 | 13 |
2011-07-07 | Perforation | 439.00 | 441.00 | 13 |
2011-03-10 | Fracture | 818.00 | 820.00 | 0 |
2011-07-19 | Fracture | 220.10 | 586.00 | 0 |
2011-03-10 | Fracture | 707.00 | 709.00 | 0 |
2011-03-10 | Fracture | 575.00 | 577.00 | 0 |
2011-07-07 | Perforation | 383.10 | 384.60 | 13 |
2011-07-07 | Perforation | 379.10 | 379.60 | 13 |
2011-07-07 | Perforation | 399.20 | 400.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3742 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8601 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]