X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274240809003

Well Details

Well ID: 0274240809003
Loading map...
Location: 00/09-08-027-24W4/3
Location Alias: 00/09-08-27-24 W4M
Location Alias 2: 00/09-08-027-24 W4/03
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 24
Section: 08
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-8-27-24
Operator Name: Ember Resources Inc.
License Number: 0338298
License Date: 2005-09-15
License Status: Issued
Spud Date: 2005-10-17
Final Drill Date: 2005-10-18
Well Total Depth: 730.00 m
Surface Hole Latitude: 51.295634
Surface Hole Longitude: -113.336669

For data sources see[1][2]

Well History

Date Event
2005-09-15 Obtained License
2005-10-18 Finished Drilling
2005-10-18 Surface Casing Operation Performed
2005-10-18 Well Mode changed to Drilled and Cased
2005-10-19 Production Casing Operation Performed
2005-10-19 Rig Released
2005-10-23 Well Log Performed
2005-11-27 Perforation Treatment Performed - Jet Perforation
2005-12-08 Perforation Treatment Performed - Jet Perforation
2006-01-11 Perforation Treatment Performed - Jet Perforation
2006-01-19 Perforation Treatment Performed - Fractured
2006-01-23 Well Fluid changed to Gas
2006-01-23 Well Mode changed to Testing
2006-02-10 Perforation Treatment Performed - Jet Perforation
2006-02-12 Perforation Treatment Performed - Fractured
2006-02-24 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-27 Perforation 622.50 624.50 13
2006-02-10 Perforation 515.80 516.30 13
2006-02-10 Perforation 508.40 508.90 13
2006-02-10 Perforation 502.00 502.50 13
2006-02-10 Perforation 491.50 492.00 13
2006-02-10 Perforation 484.80 485.30 13
2006-02-10 Perforation 478.00 478.50 13
2006-02-10 Perforation 440.60 441.10 13
2006-02-10 Perforation 433.00 434.00 13
2006-02-10 Perforation 421.50 422.00 13
2006-02-10 Perforation 399.10 399.60 13
2005-12-08 Perforation 613.00 616.00 13
2006-02-10 Perforation 395.00 395.50 13
2006-02-10 Perforation 393.90 394.40 13
2006-02-10 Perforation 371.00 372.00 13
2006-02-10 Perforation 314.60 315.10 13
2006-02-10 Perforation 272.90 273.40 13
2006-02-10 Perforation 266.60 267.10 13
2006-02-10 Perforation 262.60 263.10 13
2006-02-12 Fracture 262.60 558.50 0
2006-01-11 Perforation 604.50 606.50 13
2006-01-19 Fracture 604.50 606.50 0
2006-02-10 Perforation 558.00 558.50 13
2006-02-10 Perforation 555.10 555.60 13
2006-02-10 Perforation 552.40 552.90 13
2006-02-10 Perforation 549.00 549.50 13
2006-02-10 Perforation 517.80 518.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 48 0.0 0.0 0.0

For data sources see[5]

References