X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274240116008

Well Details

Well ID: 0274240116008
Loading map...
Location: 00/16-01-027-24W4/8
Location Alias: 00/16-01-27-24 W4M
Location Alias 2: 00/16-01-027-24 W4/08
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 24
Section: 01
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-1-27-24
Operator Name: Ember Resources Inc.
License Number: 0261551
License Date: 2001-11-09
License Status: Issued
Spud Date: 2001-11-15
Final Drill Date: 2001-11-19
Well Total Depth: 943.00 m
Surface Hole Latitude: 51.284215
Surface Hole Longitude: -113.244808

For data sources see[1][2]

Well History

Date Event
2001-11-09 Obtained License
2001-11-15 Surface Casing Operation Performed
2001-11-19 Finished Drilling
2001-11-19 Production Casing Operation Performed
2001-11-19 Rig Released
2001-11-19 Well Mode changed to Drilled and Cased
2001-11-25 Well Log Performed
2001-11-29 Well Log Performed
2002-01-12 Perforation Treatment Performed - Jet Perforation
2002-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-19 Perforation Treatment Performed - Jet Perforation
2002-02-19 Plug Back Performed
2002-02-28 Perforation Treatment Performed - Jet Perforation
2002-03-18 Perforation Treatment Performed - Jet Perforation
2002-06-07 Perforation Treatment Performed - Fractured
2002-07-05 Perforation Treatment Performed - Jet Perforation
2002-09-19 Perforation Treatment Performed - Fractured
2002-10-16 Perforation Treatment Performed - Jet Perforation
2002-11-26 Perforation Treatment Performed - Jet Perforation
2003-01-10 Perforation Treatment Performed - Fractured
2003-01-28 Perforation Treatment Performed - Jet Perforation
2006-01-06 Perforation Treatment Performed - Jet Perforation
2006-01-14 Perforation Treatment Performed - Fractured
2006-02-16 Well Began Production
2006-02-16 Well Fluid changed to Coalbed Methane-Coals and Other
2006-02-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-01-12 Perforation 786.00 788.00 7
2002-07-05 Perforation 593.50 596.50 7
2002-07-05 Perforation 586.00 588.00 7
2002-07-05 Perforation 580.00 584.00 7
2002-07-05 Perforation 589.00 591.00 7
2002-09-19 Fracture 582.00 596.00 0
2002-10-16 Perforation 563.00 568.00 7
2002-11-26 Perforation 450.00 452.00 7
2003-01-10 Fracture 450.00 452.00 0
2003-01-28 Perforation 406.00 409.00 13
2006-01-06 Perforation 522.30 522.80 13
2002-01-12 Perforation 782.00 784.00 7
2006-01-06 Perforation 515.80 516.30 13
2006-01-06 Perforation 514.70 515.20 13
2006-01-06 Perforation 513.20 513.70 13
2006-01-06 Perforation 486.60 487.10 13
2006-01-06 Perforation 484.60 485.10 13
2006-01-06 Perforation 483.50 484.00 13
2006-01-06 Perforation 478.90 479.40 13
2006-01-06 Perforation 471.80 472.30 13
2006-01-06 Perforation 465.30 465.80 13
2006-01-06 Perforation 460.70 461.20 13
2002-01-12 Perforation 778.00 780.00 7
2006-01-06 Perforation 393.50 394.00 13
2006-01-06 Perforation 393.50 394.00 13
2006-01-06 Perforation 390.50 391.00 13
2006-01-06 Perforation 387.80 388.30 13
2006-01-06 Perforation 367.60 368.10 13
2006-01-06 Perforation 366.10 366.60 13
2006-01-06 Perforation 362.70 363.20 13
2006-01-06 Perforation 361.60 362.10 13
2006-01-06 Perforation 343.60 344.10 13
2006-01-06 Perforation 342.40 342.90 13
2002-02-19 Packing Device Capped w/Cement 775.00 783.00 0
2006-01-06 Perforation 340.70 341.20 13
2006-01-06 Perforation 290.50 291.00 13
2006-01-06 Perforation 249.00 249.50 13
2006-01-06 Perforation 244.00 244.50 13
2006-01-06 Perforation 222.90 223.40 13
2006-01-14 Fracture 222.90 522.80 0
2002-02-19 Perforation 759.00 761.00 7
2002-02-28 Perforation 740.00 743.00 7
2002-03-18 Perforation 696.50 698.50 7
2002-03-18 Perforation 693.00 695.00 7
2002-06-07 Fracture 693.00 698.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7493 0.0 0.0 0.0
2007 8540 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 4690 0.0 0.0 0.0
2011 4014 0.0 0.0 0.0
2012 7534 0.0 0.0 0.0
2013 7108 0.0 0.0 0.0
2014 2854 0.0 0.0 0.0
2015 7236 0.0 0.0 0.0
2016 7630 0.0 0.0 0.0
2017 4747 0.0 0.0 0.0
2018 7530 0.0 0.0 0.0
2019 6807 0.0 0.0 0.0
2020 2029 0.0 0.0 0.0

For data sources see[5]

References