If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274240116004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.284215,"lon":-113.244808,"icon":""}]} |
Location: 00/16-01-027-24W4/4 | |
Location Alias: 00/16-01-27-24 W4M | |
Location Alias 2: 00/16-01-027-24 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 24 | |
Section: 01 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 16-1-27-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0261551 | |
License Date: 2001-11-09 | |
License Status: Issued | |
Spud Date: 2001-11-15 | |
Final Drill Date: 2001-11-19 | |
Well Total Depth: 943.00 m | |
Surface Hole Latitude: 51.284215 | |
Surface Hole Longitude: -113.244808 |
Date | Event |
---|---|
2001-11-09 | Obtained License |
2001-11-15 | Surface Casing Operation Performed |
2001-11-19 | Finished Drilling |
2001-11-19 | Production Casing Operation Performed |
2001-11-19 | Rig Released |
2001-11-19 | Well Mode changed to Drilled and Cased |
2001-11-25 | Well Log Performed |
2001-11-29 | Well Log Performed |
2002-01-12 | Perforation Treatment Performed - Jet Perforation |
2002-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-19 | Perforation Treatment Performed - Jet Perforation |
2002-02-19 | Plug Back Performed |
2002-02-28 | Perforation Treatment Performed - Jet Perforation |
2002-03-18 | Perforation Treatment Performed - Jet Perforation |
2002-06-07 | Perforation Treatment Performed - Fractured |
2002-07-05 | Perforation Treatment Performed - Jet Perforation |
2002-07-13 | Well Fluid changed to Gas |
2002-07-13 | Well Mode changed to Testing |
2002-09-19 | Perforation Treatment Performed - Fractured |
2002-10-16 | Perforation Treatment Performed - Jet Perforation |
2002-10-16 | Well Fluid changed to Gas |
2002-10-16 | Well Mode changed to Test Completed |
2002-11-26 | Perforation Treatment Performed - Jet Perforation |
2003-01-10 | Perforation Treatment Performed - Fractured |
2003-01-28 | Perforation Treatment Performed - Jet Perforation |
2006-01-06 | Perforation Treatment Performed - Jet Perforation |
2006-01-14 | Perforation Treatment Performed - Fractured |
2006-02-16 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-01-12 | Perforation | 786.00 | 788.00 | 7 |
2002-07-05 | Perforation | 593.50 | 596.50 | 7 |
2002-07-05 | Perforation | 586.00 | 588.00 | 7 |
2002-07-05 | Perforation | 580.00 | 584.00 | 7 |
2002-07-05 | Perforation | 589.00 | 591.00 | 7 |
2002-09-19 | Fracture | 582.00 | 596.00 | 0 |
2002-10-16 | Perforation | 563.00 | 568.00 | 7 |
2002-11-26 | Perforation | 450.00 | 452.00 | 7 |
2003-01-10 | Fracture | 450.00 | 452.00 | 0 |
2003-01-28 | Perforation | 406.00 | 409.00 | 13 |
2006-01-06 | Perforation | 522.30 | 522.80 | 13 |
2002-01-12 | Perforation | 782.00 | 784.00 | 7 |
2006-01-06 | Perforation | 515.80 | 516.30 | 13 |
2006-01-06 | Perforation | 514.70 | 515.20 | 13 |
2006-01-06 | Perforation | 513.20 | 513.70 | 13 |
2006-01-06 | Perforation | 486.60 | 487.10 | 13 |
2006-01-06 | Perforation | 484.60 | 485.10 | 13 |
2006-01-06 | Perforation | 483.50 | 484.00 | 13 |
2006-01-06 | Perforation | 478.90 | 479.40 | 13 |
2006-01-06 | Perforation | 471.80 | 472.30 | 13 |
2006-01-06 | Perforation | 465.30 | 465.80 | 13 |
2006-01-06 | Perforation | 460.70 | 461.20 | 13 |
2002-01-12 | Perforation | 778.00 | 780.00 | 7 |
2006-01-06 | Perforation | 393.50 | 394.00 | 13 |
2006-01-06 | Perforation | 393.50 | 394.00 | 13 |
2006-01-06 | Perforation | 390.50 | 391.00 | 13 |
2006-01-06 | Perforation | 387.80 | 388.30 | 13 |
2006-01-06 | Perforation | 367.60 | 368.10 | 13 |
2006-01-06 | Perforation | 366.10 | 366.60 | 13 |
2006-01-06 | Perforation | 362.70 | 363.20 | 13 |
2006-01-06 | Perforation | 361.60 | 362.10 | 13 |
2006-01-06 | Perforation | 343.60 | 344.10 | 13 |
2006-01-06 | Perforation | 342.40 | 342.90 | 13 |
2002-02-19 | Packing Device Capped w/Cement | 775.00 | 783.00 | 0 |
2006-01-06 | Perforation | 340.70 | 341.20 | 13 |
2006-01-06 | Perforation | 290.50 | 291.00 | 13 |
2006-01-06 | Perforation | 249.00 | 249.50 | 13 |
2006-01-06 | Perforation | 244.00 | 244.50 | 13 |
2006-01-06 | Perforation | 222.90 | 223.40 | 13 |
2006-01-14 | Fracture | 222.90 | 522.80 | 0 |
2002-02-19 | Perforation | 759.00 | 761.00 | 7 |
2002-02-28 | Perforation | 740.00 | 743.00 | 7 |
2002-03-18 | Perforation | 696.50 | 698.50 | 7 |
2002-03-18 | Perforation | 693.00 | 695.00 | 7 |
2002-06-07 | Fracture | 693.00 | 698.50 | 0 |
For data sources see[4]