X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274233116002

Well Details

Well ID: 0274233116002
Loading map...
Location: 00/16-31-027-23W4/2
Location Alias: 00/16-31-27-23 W4M
Location Alias 2: 00/16-31-027-23 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 23
Section: 31
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-31-27-23
Operator Name: Ember Resources Inc.
License Number: 0328293
License Date: 2005-03-18
License Status: Issued
Spud Date: 2005-05-07
Final Drill Date: 2005-05-13
Well Total Depth: 610.00 m
Surface Hole Latitude: 51.354468
Surface Hole Longitude: -113.217245

For data sources see[1][2]

Well History

Date Event
2005-03-18 Obtained License
2005-05-07 Surface Casing Operation Performed
2005-05-13 Finished Drilling
2005-05-13 Production Casing Operation Performed
2005-05-13 Rig Released
2005-05-13 Well Mode changed to Drilled and Cased
2005-07-12 Well Log Performed
2005-07-24 Perforation Treatment Performed - Jet Perforation
2005-11-25 Perforation Treatment Performed - Jet Perforation
2005-12-04 Perforation Treatment Performed - Fractured
2005-12-11 Well Began Production
2005-12-11 Well Fluid changed to Coalbed Methane-Coals and Other
2005-12-11 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-24 Perforation 404.00 408.00 13
2005-11-25 Perforation 425.30 425.80 13
2005-11-25 Perforation 416.70 417.20 13
2005-11-25 Perforation 375.70 376.20 13
2005-11-25 Perforation 370.30 370.80 13
2005-11-25 Perforation 365.50 366.00 13
2005-11-25 Perforation 363.10 363.60 13
2005-11-25 Perforation 360.50 361.00 13
2005-11-25 Perforation 355.40 355.90 13
2005-11-25 Perforation 333.50 334.00 13
2005-11-25 Perforation 331.90 332.40 13
2005-11-25 Perforation 501.20 501.70 13
2005-11-25 Perforation 327.60 328.10 13
2005-11-25 Perforation 321.30 321.80 13
2005-11-25 Perforation 309.50 310.00 13
2005-11-25 Perforation 308.30 308.80 13
2005-11-25 Perforation 301.50 302.00 13
2005-11-25 Perforation 295.00 295.50 13
2005-11-25 Perforation 293.00 293.50 13
2005-11-25 Perforation 279.10 279.60 13
2005-11-25 Perforation 268.70 269.20 13
2005-11-25 Perforation 260.30 261.30 13
2005-11-25 Perforation 495.20 495.70 13
2005-11-25 Perforation 240.90 241.40 13
2005-11-25 Perforation 238.10 238.60 13
2005-11-25 Perforation 232.50 233.00 13
2005-11-25 Perforation 212.50 213.00 13
2005-11-25 Perforation 202.30 202.80 13
2005-11-25 Perforation 198.30 198.80 13
2005-11-25 Perforation 193.20 193.70 13
2005-11-25 Perforation 187.20 187.70 13
2005-12-04 Fracture 187.20 501.70 0
2005-11-25 Perforation 491.50 492.00 13
2005-11-25 Perforation 487.80 488.80 13
2005-11-25 Perforation 453.40 455.40 13
2005-11-25 Perforation 448.50 449.00 13
2005-11-25 Perforation 442.20 442.70 13
2005-11-25 Perforation 433.80 434.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 504 0.0 0.0 0.0
2006 8595 0.0 0.0 0.0
2007 8391 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8702 0.0 0.0 0.0
2012 8593 0.0 0.0 0.0
2013 8390 0.0 0.0 0.0
2014 8714 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8596 0.0 0.0 0.0
2018 8714 0.0 0.0 0.0
2019 8537 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[5]

References