X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274232908000

Well Details

Well ID: 0274232908000
Loading map...
Location: 00/08-29-027-23W4/0
Location Alias: 00/08-29-27-23 W4M
Location Alias 2: 00/08-29-027-23 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 23
Section: 29
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 8-29-27-23
Operator Name: Ember Resources Inc.
License Number: 0317138
License Date: 2004-10-20
License Status: Issued
Spud Date: 2005-02-10
Final Drill Date: 2005-02-15
Well Total Depth: 858.00 m
Surface Hole Latitude: 51.333617
Surface Hole Longitude: -113.193700

For data sources see[1][2]

Well History

Date Event
2004-10-20 Obtained License
2005-02-10 Surface Casing Operation Performed
2005-02-15 Finished Drilling
2005-02-15 Well Mode changed to Drilled and Cased
2005-02-16 Production Casing Operation Performed
2005-02-16 Rig Released
2005-02-17 Well Log Performed
2005-03-19 Perforation Treatment Performed - Jet Perforation
2005-04-25 Perforation Treatment Performed - Fractured
2005-05-20 Well Began Production
2005-05-20 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-20 Well Mode changed to Flowing
2010-01-29 Perforation Treatment Performed - Jet Perforation
2010-02-16 Perforation Treatment Performed - Fractured
2010-02-19 Well Structure changed to Commingled
2010-02-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-19 Perforation 484.80 485.30 13
2005-03-19 Perforation 403.20 403.70 13
2005-03-19 Perforation 393.20 393.70 13
2005-03-19 Perforation 352.60 353.10 13
2005-03-19 Perforation 343.40 343.90 13
2005-03-19 Perforation 339.40 339.90 13
2005-03-19 Perforation 337.30 337.80 13
2005-03-19 Perforation 335.10 335.60 13
2005-03-19 Perforation 330.90 331.40 13
2005-03-19 Perforation 312.00 313.00 13
2005-03-19 Perforation 307.30 307.80 13
2005-03-19 Perforation 479.20 479.70 13
2005-03-19 Perforation 300.60 301.10 13
2005-03-19 Perforation 295.10 295.60 13
2005-03-19 Perforation 288.20 288.70 13
2005-03-19 Perforation 282.10 282.60 13
2005-03-19 Perforation 275.00 275.50 13
2005-03-19 Perforation 250.30 250.80 13
2005-03-19 Perforation 241.30 241.80 13
2005-03-19 Perforation 201.00 202.00 13
2005-03-19 Perforation 187.40 187.90 13
2005-03-19 Perforation 182.30 182.80 13
2005-03-19 Perforation 470.60 471.10 13
2005-03-19 Perforation 180.10 180.60 13
2005-04-25 Fracture 180.10 485.30 0
2010-01-29 Perforation 226.00 227.00 13
2010-01-29 Perforation 261.00 262.00 13
2010-01-29 Perforation 519.00 521.00 13
2010-01-29 Perforation 364.00 367.00 13
2010-01-29 Perforation 761.00 762.00 13
2010-02-16 Fracture 519.00 521.00 0
2010-02-28 Fracture 226.00 367.00 0
2010-02-28 Fracture 241.30 485.30 0
2005-03-19 Perforation 466.60 467.10 13
2005-03-19 Perforation 433.90 434.40 13
2005-03-19 Perforation 431.40 431.90 13
2005-03-19 Perforation 425.40 425.90 13
2005-03-19 Perforation 419.00 419.50 13
2005-03-19 Perforation 411.70 412.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5376 0.0 0.0 0.0
2006 8597 0.0 0.0 0.0
2007 8390 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 1416 0.0 0.0 0.0

For data sources see[5]

References