X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274232710002

Well Details

Well ID: 0274232710002
Loading map...
Location: 00/10-27-027-23W4/2
Location Alias: 00/10-27-27-23 W4M
Location Alias 2: 00/10-27-027-23 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 23
Section: 27
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 10-27-27-23
Operator Name: Ember Resources Inc.
License Number: 0207707
License Date: 1997-10-29
License Status: Issued
Spud Date: 1997-12-03
Final Drill Date: 1997-12-09
Well Total Depth: 1620.00 m
Surface Hole Latitude: 51.339177
Surface Hole Longitude: -113.153814

For data sources see[1][2]

Well History

Date Event
1997-10-29 Obtained License
1997-12-03 Surface Casing Operation Performed
1997-12-09 Finished Drilling
1997-12-09 Well Log Performed
1997-12-09 Well Mode changed to Drilled and Cased
1997-12-12 Production Casing Operation Performed
1997-12-12 Rig Released
1997-12-12 Well Log Performed
1998-01-10 Well Log Performed
1998-01-11 Perforation Treatment Performed - Jet Perforation
1998-01-29 Well Log Performed
1998-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-30 Plug Back Performed
1998-01-31 Well Log Performed
1998-02-01 Perforation Treatment Performed - Jet Perforation
1998-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-28 Plug Back Performed
2003-06-27 Perforation Treatment Performed - Jet Perforation
2003-06-27 Well Log Performed
2003-09-11 Perforation Treatment Performed - Jet Perforation
2003-09-14 Well Fluid changed to Gas
2003-09-14 Well Mode changed to Testing
2005-05-06 Perforation Treatment Performed - Jet Perforation
2005-05-09 Perforation Treatment Performed - Remedial Casing
2005-05-16 Well Began Production
2005-05-16 Well Fluid changed to Gas
2005-05-16 Well Mode changed to Flowing
2018-09-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-01-11 Perforation 1582.00 1585.00 17
2005-05-06 Perforation 248.00 249.00 17
2005-05-09 Remedial Casing Cementing 248.00 249.00 0
1998-01-30 Packing Device Capped w/Cement 1565.00 1573.00 0
1998-02-01 Perforation 1334.00 1338.00 20
1998-02-28 Packing Device Capped w/Cement 1316.00 1324.00 0
2003-06-27 Perforation 959.00 962.00 13
2003-09-11 Perforation 760.00 761.00 13
2003-09-11 Perforation 713.00 715.00 13
2003-09-11 Perforation 675.00 678.00 13
2003-09-11 Perforation 515.00 517.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5472 0.0 0.0 0.0
2006 8597 0.0 0.0 0.0
2007 8390 0.0 0.0 0.0
2008 8039 0.0 0.0 0.0
2009 3024 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8738 0.0 0.0 0.0
2012 8686 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8616 0.0 0.0 0.0
2015 8674 0.0 0.0 0.0
2016 8745 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 7332 0.0 0.0 0.0
2019 4716 0.0 0.0 0.0

For data sources see[5]

References