If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274231612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.310014,"lon":-113.191557,"icon":""}]} |
Location: 00/12-16-027-23W4/0 | |
Location Alias: 00/12-16-27-23 W4M | |
Location Alias 2: 00/12-16-027-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 23 | |
Section: 16 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 12-16-27-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0260848 | |
License Date: 2001-10-22 | |
License Status: Issued | |
Spud Date: 2001-10-27 | |
Final Drill Date: 2001-11-01 | |
Well Total Depth: 846.00 m | |
Surface Hole Latitude: 51.310014 | |
Surface Hole Longitude: -113.191557 |
Date | Event |
---|---|
2001-10-22 | Obtained License |
2001-10-27 | Surface Casing Operation Performed |
2001-11-01 | Finished Drilling |
2001-11-01 | Production Casing Operation Performed |
2001-11-01 | Rig Released |
2001-11-01 | Well Mode changed to Drilled and Cased |
2001-11-04 | Well Log Performed |
2001-12-06 | Perforation Treatment Performed - Jet Perforation |
2002-02-03 | Perforation Treatment Performed - Fractured |
2002-02-06 | Perforation Treatment Performed - Jet Perforation |
2002-03-02 | Perforation Treatment Performed - Fractured |
2002-03-19 | Perforation Treatment Performed - Jet Perforation |
2002-06-07 | Perforation Treatment Performed - Fractured |
2002-07-04 | Perforation Treatment Performed - Jet Perforation |
2002-08-11 | Perforation Treatment Performed - Fractured |
2002-09-19 | Well Began Production |
2002-09-19 | Well Fluid changed to Gas |
2002-09-19 | Well Mode changed to Flowing |
2007-01-18 | Perforation Treatment Performed - Jet Perforation |
2007-01-21 | Perforation Treatment Performed - Fractured |
2007-02-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-12-06 | Perforation | 739.00 | 742.00 | 7 |
2007-01-18 | Perforation | 440.70 | 441.20 | 13 |
2007-01-18 | Perforation | 408.70 | 409.20 | 13 |
2007-01-18 | Perforation | 400.00 | 400.50 | 13 |
2007-01-18 | Perforation | 392.70 | 393.20 | 13 |
2007-01-18 | Perforation | 386.00 | 387.00 | 13 |
2007-01-18 | Perforation | 377.40 | 378.40 | 13 |
2007-01-18 | Perforation | 369.80 | 370.30 | 13 |
2007-01-18 | Perforation | 320.20 | 320.70 | 13 |
2007-01-18 | Perforation | 316.90 | 317.90 | 13 |
2007-01-18 | Perforation | 308.40 | 308.90 | 13 |
2001-12-06 | Perforation | 728.00 | 731.00 | 7 |
2007-01-18 | Perforation | 306.00 | 307.00 | 13 |
2007-01-18 | Perforation | 302.50 | 303.00 | 13 |
2007-01-18 | Perforation | 296.60 | 297.10 | 13 |
2007-01-18 | Perforation | 286.40 | 288.40 | 13 |
2007-01-18 | Perforation | 280.00 | 280.50 | 13 |
2007-01-18 | Perforation | 260.00 | 260.50 | 13 |
2007-01-18 | Perforation | 246.40 | 246.90 | 13 |
2007-01-18 | Perforation | 213.30 | 213.80 | 13 |
2007-01-18 | Perforation | 206.10 | 206.60 | 13 |
2007-01-21 | Fracture | 206.10 | 441.20 | 0 |
2002-02-03 | Fracture | 728.00 | 742.00 | 0 |
2002-02-06 | Perforation | 636.00 | 638.00 | 7 |
2002-03-02 | Fracture | 636.00 | 638.00 | 0 |
2002-03-19 | Perforation | 366.00 | 368.00 | 7 |
2002-06-07 | Fracture | 366.00 | 368.00 | 0 |
2002-07-04 | Perforation | 336.00 | 340.00 | 7 |
2002-08-11 | Fracture | 336.00 | 340.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 2491 | 0.0 | 0.0 | 0.0 |
2003 | 8296 | 0.0 | 0.0 | 0.0 |
2004 | 7880 | 0.0 | 0.0 | 0.0 |
2005 | 8579 | 0.0 | 0.0 | 0.0 |
2006 | 8095 | 0.0 | 0.0 | 0.0 |
2007 | 8135 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8697 | 0.0 | 0.0 | 0.0 |
2011 | 8694 | 0.0 | 0.0 | 0.0 |
2012 | 8734 | 0.0 | 0.0 | 0.0 |
2013 | 8165 | 0.0 | 0.0 | 0.0 |
2014 | 7463 | 0.0 | 0.0 | 0.0 |
2015 | 7823 | 0.0 | 0.0 | 0.0 |
2016 | 8504 | 0.0 | 0.0 | 0.0 |
2017 | 8751 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8632 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]