X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274151206000

Well Details

Well ID: 0274151206000
Loading map...
Location: 00/06-12-027-15W4/0
Location Alias: 00/06-12-27-15 W4M
Location Alias 2: 00/06-12-027-15 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 15
Section: 12
County/Municipality: Special Areas No. 2
Well Name: KEWANEE A CESS 6-12-27-15
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0016880
License Date: 1959-03-25
License Status: RecCertified
Spud Date: 1959-03-26
Final Drill Date: 1959-04-12
Well Total Depth: 1150.60 m
Surface Hole Latitude: 51.290513
Surface Hole Longitude: -111.988742

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-03-25 Obtained License
1959-04-03 Drill Stem Test Performed
1959-04-05 Drill Stem Test Performed
1959-04-06 Drill Stem Test Performed
1959-04-11 Drill Stem Test Performed
1959-04-12 Finished Drilling
1959-04-13 Production Casing Operation Performed
1959-04-14 Well Mode changed to Drilled and Cased
1959-08-18 Perforation Treatment Performed - Bullet Perforation
1959-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-23 Perforation Treatment Performed - Jet Perforation
1960-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-11-01 Well Began Production
1960-11-01 Well Fluid changed to Gas
1960-11-01 Well Mode changed to Flowing
1962-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1962-03-21 Perforation Treatment Performed - Fractured
1962-03-27 Perforation Treatment Performed - Condensate Squeeze
1962-10-28 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-12-23 Perforation Treatment Performed - Fractured
1964-01-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-04 Perforation Treatment Performed - Fractured
1964-02-05 Well Fluid changed to Gas
1964-02-05 Well Mode changed to Flowing
1966-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-11-08 Well Fluid changed to Gas
1966-11-08 Well Mode changed to Abandoned Zone
1989-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-26 Perforation Treatment Performed - Jet Perforation
1989-10-26 Plug Back Performed
1989-10-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-08-18 Bullet Perforation 1115.90 1118.90 13
1962-12-23 Fracture 1047.60 1047.60 0
1964-01-30 Hydra Jet Perforation 978.80 982.10 10
1964-02-02 Acid Treatment 978.80 982.10 0
1964-02-04 Fracture 978.80 982.10 0
1966-11-08 Packing Device Capped w/Cement 1012.90 1018.90 0
1989-10-26 Packing Device Capped w/Cement 965.00 978.00 0
1989-10-26 Perforation 308.00 309.00 10
1989-10-26 Packing Device Capped w/Cement 297.00 305.00 0
1959-08-19 Acid Treatment 1115.90 1118.90 0
1959-08-23 Perforation 1047.60 1050.30 13
1959-08-23 Acid Treatment 1047.60 1050.30 0
1960-09-01 Packing Device Capped w/Cement 1110.40 1110.40 0
1962-03-21 Acid Wash 1047.60 1050.30 0
1962-03-21 Fracture 1047.60 1050.30 0
1962-03-27 Condensate Squeeze 1047.60 1050.30 0
1962-10-28 Hydra Jet Perforation 1047.60 1047.60 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References