X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274092307002

Well Details

Well ID: 0274092307002
Loading map...
Location: 00/07-23-027-09W4/2
Location Alias: 00/07-23-27-09 W4M
Location Alias 2: 00/07-23-027-09 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 09
Section: 23
County/Municipality: Special Areas No. 3
Well Name: RIDGEBACK HEATHDLE 7-23-27-9
Operator Name: Ridgeback Resources Inc.
License Number: 0076601
License Date: 1979-06-27
License Status: Abandoned
Spud Date: 1979-07-07
Final Drill Date: 1979-07-11
Well Total Depth: 1061.00 m
Surface Hole Latitude: 51.319632
Surface Hole Longitude: -111.160478

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-27 Obtained License
1979-07-11 Finished Drilling
1979-07-12 Drill Stem Test Performed
1979-07-12 Well Log Performed
1979-07-13 Drill Stem Test Performed
1979-07-14 Production Casing Operation Performed
1979-07-30 Perforation Treatment Performed - Jet Perforation
1979-07-31 Perforation Treatment Performed - Acid Wash - No Pressure
1988-10-15 Perforation Treatment Performed - Fractured
1992-03-04 Well Log Performed
1992-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-05 Perforation Treatment Performed - Jet Perforation
1992-03-05 Plug Back Performed
1992-03-05 Well Mode changed to Drilled and Cased
1992-03-11 Well Began Production
1992-03-11 Well Fluid changed to Gas
1992-03-11 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Suspended
2008-07-05 Perforation Treatment Performed - Cement Squeeze
2008-07-05 Plug Back Performed
2008-07-05 Well Fluid changed to Gas
2008-07-05 Well Mode changed to Abandoned Zone
2008-07-15 Perforation Treatment Performed - Jet Perforation
2008-07-15 Well Log Performed
2008-07-30 Perforation Treatment Performed - Fractured
2010-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-29 Plug Back Performed
2010-01-30 Well Log Performed
2010-01-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-30 Perforation 997.00 999.00 7
2010-01-29 Packing Device Capped w/Cement 982.00 990.00 0
2010-01-29 Packing Device Capped w/Cement 836.00 844.00 0
1979-07-31 Acid Wash 997.00 999.00 0
1988-10-15 Fracture 997.00 999.00 0
1992-03-05 Packing Device Capped w/Cement 984.00 992.00 0
1992-03-05 Perforation 848.00 850.00 14
2008-07-05 Cement Squeeze 848.00 850.00 0
2008-07-15 Perforation 1025.00 1027.00 17
2008-07-30 Fracture 1025.00 1027.00 0
2010-01-29 Packing Device Capped w/Cement 1010.00 1018.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5752 0.0 0.0 0.0
1993 8384 0.0 0.0 0.0
1994 8492 0.0 0.0 0.0
1995 6679 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 5522 0.0 0.0 0.0
1998 3599 0.0 0.0 0.0
1999 6215 0.0 0.0 0.0
2000 919 0.0 0.0 0.0
2001 467 0.0 0.0 0.0

For data sources see[5]

References