X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274091807002

Well Details

Well ID: 0274091807002
Loading map...
Location: 00/07-18-027-09W4/2
Location Alias: 00/07-18-27-09 W4M
Location Alias 2: 00/07-18-027-09 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 09
Section: 18
County/Municipality: Special Areas No. 3
Well Name: CNRES HEATHDALE 7-18-27-9
Operator Name: Canadian Natural Resources Limited
License Number: 0241157
License Date: 2000-08-21
License Status: Suspension
Spud Date: 2000-08-28
Final Drill Date: 2000-08-31
Well Total Depth: 1068.00 m
Surface Hole Latitude: 51.306031
Surface Hole Longitude: -111.256206

For data sources see[1][2]

Well History

Date Event
2000-08-21 Obtained License
2000-08-28 Well Log Performed
2000-08-29 Surface Casing Operation Performed
2000-08-31 Finished Drilling
2000-08-31 Well Log Performed
2000-08-31 Well Mode changed to Drilled and Cased
2000-09-01 Rig Released
2000-09-04 Production Casing Operation Performed
2000-09-07 Perforation Treatment Performed - Jet Perforation
2000-09-07 Well Log Performed
2000-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-08 Perforation Treatment Performed - Jet Perforation
2000-09-08 Plug Back Performed
2000-09-08 Well Log Performed
2000-09-08 Well Mode changed to Drilled and Cased
2000-09-09 Well Log Performed
2000-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-10 Perforation Treatment Performed - Jet Perforation
2000-09-10 Plug Back Performed
2000-09-10 Well Log Performed
2000-09-10 Well Mode changed to Abandoned Zone
2000-09-12 Perforation Treatment Performed - Fractured
2004-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-24 Perforation Treatment Performed - Jet Perforation
2004-07-24 Plug Back Performed
2004-07-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-07 Perforation 1047.00 1050.00 13
2004-07-24 Perforation 338.50 340.50 17
2000-09-08 Packing Device Capped w/Cement 1043.00 1046.00 0
2000-09-08 Perforation 1039.00 1041.00 13
2000-09-10 Packing Device Capped w/Cement 1030.00 1038.00 0
2000-09-10 Perforation 1018.00 1020.00 13
2000-09-10 Perforation 866.00 870.00 13
2000-09-12 Fracture 866.00 870.00 0
2004-07-24 Packing Device Capped w/Cement 1007.00 1015.00 0
2004-07-24 Packing Device Capped w/Cement 851.00 859.00 0

For data sources see[4]



References