If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274090106003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.276518,"lon":-111.142281,"icon":""}]} |
Location: 00/06-01-027-09W4/3 | |
Location Alias: 00/06-01-27-09 W4M | |
Location Alias 2: 00/06-01-027-09 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Special Areas No. 3 | |
Well Name: GULF ET AL HEATHDALE 6-1-27-9 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0081328 | |
License Date: 1980-02-25 | |
License Status: RecCertified | |
Spud Date: 1980-03-24 | |
Final Drill Date: 1980-03-29 | |
Well Total Depth: 1065.00 m | |
Surface Hole Latitude: 51.276518 | |
Surface Hole Longitude: -111.142281 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-02-25 | Obtained License |
1980-03-29 | Drill Stem Test Performed |
1980-03-29 | Finished Drilling |
1980-03-29 | Well Mode changed to Drilled and Cased |
1980-03-30 | Drill Stem Test Performed |
1980-03-31 | Drill Stem Test Performed |
1980-04-01 | Production Casing Operation Performed |
1980-04-30 | Perforation Treatment Performed - Jet Perforation |
1980-05-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-10-12 | Well Log Performed |
1988-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-10-13 | Perforation Treatment Performed - Jet Perforation |
1988-10-13 | Plug Back Performed |
1988-10-15 | Perforation Treatment Performed - Fractured |
1989-10-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-02-27 | Perforation Treatment Performed - Jet Perforation |
1990-02-27 | Plug Back Performed |
1990-02-27 | Well Log Performed |
1990-03-13 | Well Began Production |
1990-03-13 | Well Fluid changed to Gas |
1990-03-13 | Well Mode changed to Flowing |
1990-05-01 | Well Fluid changed to Gas |
1990-05-01 | Well Mode changed to Suspended |
1997-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-08-25 | Plug Back Performed |
1997-09-06 | Well Abandoned |
1997-09-06 | Well Fluid changed to Gas |
1997-09-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-04-30 | Perforation | 1027.50 | 1029.50 | 7 |
1980-05-01 | Acid Treatment | 1027.50 | 1029.50 | 0 |
1988-10-13 | Packing Device Capped w/Cement | 1024.00 | 1026.00 | 0 |
1988-10-13 | Perforation | 1020.50 | 1022.50 | 7 |
1988-10-15 | Fracture | 1020.50 | 1022.50 | 0 |
1989-10-17 | Acid Treatment | 1020.50 | 1022.50 | 0 |
1990-02-27 | Packing Device Capped w/Cement | 1010.00 | 1018.00 | 0 |
1990-02-27 | Perforation | 873.00 | 874.00 | 7 |
1997-08-25 | Packing Device Capped w/Cement | 860.70 | 868.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]