X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274052307000

Well Details

Well ID: 0274052307000
Loading map...
Location: 00/07-23-027-05W4/0
Location Alias: 00/07-23-27-05 W4M
Location Alias 2: 00/07-23-027-05 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 05
Section: 23
County/Municipality: Special Areas No. 3
Well Name: BONANZA EL CINCO OYEN 7-23-27-5
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0033360
License Date: 1967-12-28
License Status: RecCertified
Spud Date: 1967-12-31
Final Drill Date: 1968-01-10
Well Total Depth: 1008.90 m
Surface Hole Latitude: 51.319682
Surface Hole Longitude: -110.599750

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-12-28 Obtained License
1968-01-10 Finished Drilling
1968-01-10 Well Mode changed to Drilled and Cased
1968-01-12 Drill Stem Test Performed
1968-01-13 Drill Stem Test Performed
1968-01-14 Production Casing Operation Performed
1968-01-22 Perforation Treatment Performed - Jet Perforation
1970-11-18 Well Began Production
1970-11-18 Well Fluid changed to Gas
1970-11-18 Well Mode changed to Flowing
1984-02-01 Well Fluid changed to Gas
1984-02-01 Well Mode changed to Suspended
1989-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-05-17 Plug Back Performed
1989-05-17 Well Fluid changed to Gas
1989-05-17 Well Mode changed to Abandoned
1989-06-24 Well Log Performed
1989-06-29 Perforation Treatment Performed - Jet Perforation
1989-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-03 Perforation Treatment Performed - Remedial Casing
1989-09-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-22 Perforation 793.10 793.70 13
1989-05-17 Packing Device Capped w/Cement 779.00 787.00 0
1989-06-29 Perforation 206.00 206.50 7
1989-06-29 Perforation 265.00 265.50 7
1989-07-03 Remedial Casing Cementing 206.00 265.50 0
1989-07-03 Packing Device Capped w/Cement 248.00 248.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 981 0.0 0.0 0.0
1971 8735 0.0 0.0 0.0
1972 8028 0.0 0.0 0.0
1973 8639 0.0 0.0 0.0
1974 8309 0.0 0.0 0.0
1975 8607 0.0 0.0 0.0
1976 8277 0.0 0.0 0.0
1977 8557 0.0 0.0 0.0
1978 7359 0.0 0.0 0.0
1979 8236 0.0 0.0 0.0
1980 8513 0.0 0.0 0.0
1981 7791 0.0 0.0 0.0
1982 3811 0.0 0.0 0.0

For data sources see[5]

References