X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274022310000

Well Details

Well ID: 0274022310000
Loading map...
Location: 00/10-23-027-02W4/0
Location Alias: 00/10-23-27-02 W4M
Location Alias 2: 00/10-23-027-02 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 02
Section: 23
County/Municipality: Special Areas No. 3
Well Name: STARPOINT SIBB 10-23-27-2
Operator Name: Obsidian Energy Ltd.
License Number: 0079236
License Date: 1979-11-15
License Status: Abandoned
Spud Date: 1979-11-24
Final Drill Date: 1979-11-29
Well Total Depth: 935.00 m
Surface Hole Latitude: 51.324696
Surface Hole Longitude: -110.180467

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-15 Obtained License
1979-11-29 Finished Drilling
1979-11-30 Drill Stem Test Performed
1979-12-02 Production Casing Operation Performed
1979-12-03 Well Mode changed to Drilled and Cased
1979-12-07 Perforation Treatment Performed - Jet Perforation
1980-08-05 Well Began Injection
1980-08-05 Well Fluid changed to Water
1980-08-05 Well Type changed to Disposal
1980-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-08 Perforation Treatment Performed - Jet Perforation
1980-09-01 Well Fluid changed to Water
1980-09-01 Well Type changed to Injection
1996-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-24 Perforation Treatment Performed - Jet Perforation
1996-09-24 Plug Back Performed
1996-09-25 Perforation Treatment Performed - Remedial Casing
1996-09-26 Well Abandoned
1996-09-26 Well Fluid changed to Water
1996-09-26 Well Mode changed to Abandoned
1996-09-26 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-07 Perforation 907.50 909.00 7
1980-08-08 Perforation 910.00 912.00 7
1980-08-08 Acid Treatment 907.50 912.00 0
1996-09-24 Packing Device Capped w/Cement 892.00 900.00 0
1996-09-24 Perforation 225.00 225.50 13
1996-09-25 Remedial Casing Cementing 225.00 225.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References