X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274013114023

Well Details

Well ID: 0274013114023
Loading map...
Location: 02/14-31-027-01W4/3
Location Alias: 02/14-31-27-01 W4M
Location Alias 2: 02/14-31-027-01 W4/03
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 01
Section: 31
County/Municipality: Special Areas No. 3
Well Name: STARPOINT SIBB 14-31-27-1
Operator Name: Obsidian Energy Ltd.
License Number: 0272093
License Date: 2002-07-24
License Status: Suspension
Spud Date: 2002-08-02
Final Drill Date: 2002-08-05
Well Total Depth: 966.00 m
Surface Hole Latitude: 51.356208
Surface Hole Longitude: -110.136179

For data sources see[1][2]

Well History

Date Event
2002-07-24 Obtained License
2002-08-02 Surface Casing Operation Performed
2002-08-05 Finished Drilling
2002-08-05 Well Log Performed
2002-08-05 Well Mode changed to Drilled and Cased
2002-08-06 Production Casing Operation Performed
2002-08-06 Rig Released
2002-09-10 Perforation Treatment Performed - Jet Perforation
2002-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-08 Perforation Treatment Performed - Jet Perforation
2006-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-01 Perforation Treatment Performed - Jet Perforation
2006-02-01 Plug Back Performed
2006-02-10 Perforation Treatment Performed - Jet Perforation
2006-05-10 Well Began Production
2006-05-10 Well Fluid changed to Gas
2006-05-10 Well Mode changed to Flowing
2006-10-29 Well Log Performed
2014-12-01 Well Fluid changed to Gas
2014-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-10 Perforation 902.00 904.50 17
2002-09-21 Acid Treatment 902.00 904.50 0
2002-10-08 Perforation 905.00 906.00 17
2006-02-01 Packing Device Capped w/Cement 892.00 900.00 0
2006-02-01 Perforation 844.50 846.00 17
2006-02-10 Perforation 790.00 792.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5598 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8500 0.0 0.0 0.0
2009 8540 0.0 0.0 0.0
2010 8300 0.0 0.0 0.0
2011 5827 0.0 0.0 0.0
2012 7399 0.0 0.0 0.0
2013 744 0.0 0.0 0.0

For data sources see[5]

References