If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274012311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.324869,"lon":-110.045809,"icon":""}]} |
Location: 00/11-23-027-01W4/0 | |
Location Alias: 00/11-23-27-01 W4M | |
Location Alias 2: 00/11-23-027-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 01 | |
Section: 23 | |
County/Municipality: Special Areas No. 3 | |
Well Name: PETRODYNE ET AL E SIBBALD 11-23-27-1 | |
Operator Name: Petrodyne Ltd | |
License Number: 0046361 | |
License Date: 1973-06-29 | |
License Status: RecCertified | |
Spud Date: 1973-07-06 | |
Final Drill Date: 1973-07-11 | |
Well Total Depth: 972.30 m | |
Surface Hole Latitude: 51.324869 | |
Surface Hole Longitude: -110.045809 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-06-29 | Obtained License |
1973-07-08 | Drill Stem Test Performed |
1973-07-09 | Drill Stem Test Performed |
1973-07-11 | Finished Drilling |
1973-07-12 | Blow Occurred |
1973-07-17 | Production Casing Operation Performed |
1973-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-07-27 | Perforation Treatment Performed - Jet Perforation |
1973-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-07-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1973-07-30 | Perforation Treatment Performed - Jet Perforation |
1973-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-08-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1973-08-09 | Perforation Treatment Performed - Jet Perforation |
1973-08-10 | Perforation Treatment Performed - Jet Perforation |
1973-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1973-08-19 | Perforation Treatment Performed - Cement Squeeze |
1973-08-23 | Perforation Treatment Performed - Jet Perforation |
1973-09-24 | Well Mode changed to Drilled and Cased |
1978-01-29 | Perforation Treatment Performed - Cement Squeeze |
1978-01-31 | Perforation Treatment Performed - Jet Perforation |
1978-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-10-10 | Well Began Production |
1978-10-10 | Well Fluid changed to Gas |
1978-10-10 | Well Mode changed to Flowing |
1980-02-04 | Well Fluid changed to Gas |
1980-02-04 | Well Mode changed to Suspended |
1985-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-11-06 | Plug Back Performed |
1985-11-06 | Well Fluid changed to Gas |
1985-11-06 | Well Mode changed to Abandoned |
1985-11-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-07-27 | Perforation | 909.20 | 910.40 | 7 |
1973-08-11 | Acid Treatment | 728.80 | 729.40 | 0 |
1973-08-19 | Cement Squeeze | 729.40 | 834.80 | 0 |
1973-08-19 | Packing Device Capped w/Cement | 844.30 | 844.30 | 0 |
1973-08-23 | Perforation | 804.10 | 805.30 | 7 |
1978-01-29 | Cement Squeeze | 804.10 | 805.30 | 0 |
1978-01-31 | Perforation | 803.80 | 805.90 | 7 |
1978-02-01 | Acid Treatment | 803.80 | 805.90 | 0 |
1985-11-06 | Packing Device Capped w/Cement | 782.00 | 790.00 | 0 |
1973-07-27 | Acid Treatment | 909.20 | 910.40 | 0 |
1973-07-30 | Packing Device Capped w/Cement | 899.20 | 899.20 | 0 |
1973-07-30 | Perforation | 849.20 | 849.80 | 13 |
1973-07-30 | Acid Treatment | 849.20 | 849.80 | 0 |
1973-07-31 | Acid Treatment | 849.20 | 849.80 | 0 |
1973-08-09 | Packing Device Capped w/Cement | 844.30 | 844.30 | 0 |
1973-08-09 | Perforation | 834.80 | 835.50 | 13 |
1973-08-10 | Perforation | 728.80 | 729.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 1571 | 0.0 | 0.0 | 0.0 |
1979 | 1875 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1973-07-12 | Blow | 972.30 | 972.30 |
For data sources see[6]