X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265061914000

Well Details

Well ID: 0265061914000
Loading map...
Location: 00/14-19-026-06W5/0
Location Alias: 00/14-19-26-06 W5M
Location Alias 2: 00/14-19-026-06 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 06
Section: 19
County/Municipality: Municipal District of Bighorn No. 8
Well Name: SCL 16 UNIT JUMP PDW 14-19-26-6
Operator Name: Shell Canada Limited
License Number: 0063871
License Date: 1977-05-17
License Status: Abandoned
Spud Date: 1977-06-06
Final Drill Date: 1977-11-27
Well Total Depth: 3566.20 m
Surface Hole Latitude: 51.236975
Surface Hole Longitude: -114.841804

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-17 Obtained License
1977-06-06 Direction Drilling Operation Performed - 98
1977-06-20 Lost Circulation Occurred
1977-11-11 Lost Circulation Occurred
1977-11-20 Perforation Treatment Performed - Open-Hole Completion
1977-11-20 Production Casing Operation Performed
1977-11-27 Finished Drilling
1978-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-08 Perforation Treatment Performed - Fractured
1978-04-15 Perforation Treatment Performed - Jet Perforation
1978-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-17 Perforation Treatment Performed - Fractured
1978-04-19 Perforation Treatment Performed - Jet Perforation
1978-04-20 Perforation Treatment Performed - Fractured
1978-05-29 Perforation Treatment Performed - Fractured
1978-05-29 Well Mode changed to Drilled and Cased
1978-12-05 Well Began Production
1978-12-05 Well Fluid changed to Gas
1978-12-05 Well Mode changed to Flowing
2005-12-01 Well Fluid changed to Gas
2005-12-01 Well Mode changed to Suspended
2012-06-01 Well Fluid changed to Gas
2012-06-01 Well Mode changed to Flowing
2013-12-13 Well Log Performed
2014-09-17 Well Fluid changed to Gas
2014-09-17 Well Mode changed to Suspended
2014-09-18 Well Log Performed
2014-09-19 Perforation Treatment Performed - Cement Plug
2014-09-19 Plug Back Performed
2014-09-19 Well Log Performed
2014-09-20 Perforation Treatment Performed - Jet Perforation
2014-09-20 Well Log Performed
2014-09-21 Perforation Treatment Performed - Cement Squeeze
2014-09-21 Plug Back Performed
2014-09-22 Perforation Treatment Performed - Cement Squeeze
2014-09-22 Perforation Treatment Performed - Jet Perforation
2014-09-22 Plug Back Performed
2014-09-22 Well Log Performed
2014-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-23 Perforation Treatment Performed - Jet Perforation
2014-09-23 Plug Back Performed
2014-09-23 Well Log Performed
2015-06-29 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1977-06-06 2475.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-20 Open Hole/Barefoot Completion 3474.70 3566.20 0
1978-04-16 Acid Treatment 3325.70 3402.80 0
1978-04-17 Fracture 3325.70 3402.80 0
1978-04-19 Perforation 3358.90 3385.70 3
1978-04-20 Fracture 3358.90 3385.70 0
1978-05-29 Fracture 3325.70 3402.80 0
2014-09-19 Cement Plug 3187.00 3239.00 0
2014-09-20 Perforation 2132.00 2133.00 17
2014-09-20 Perforation 2114.00 2115.00 17
2014-09-20 Perforation 1970.00 1972.00 17
2014-09-20 Perforation 1914.00 1915.00 17
1978-03-27 Acid Treatment 3474.70 3566.20 0
2014-09-21 Cement Squeeze 1914.00 2133.00 0
2014-09-22 Perforation 1352.00 1353.00 17
2014-09-22 Cement Squeeze 1352.00 1353.00 0
2014-09-23 Perforation 500.00 501.00 17
2014-09-23 Packing Device Capped w/Cement 460.00 501.00 0
1978-04-08 Fracture 3474.70 3566.20 0
1978-04-15 Perforation 3325.70 3335.70 7
1978-04-15 Perforation 3337.90 3339.70 7
1978-04-15 Perforation 3350.40 3352.50 7
1978-04-15 Perforation 3390.70 3391.20 7
1978-04-15 Perforation 3393.60 3396.10 7
1978-04-15 Perforation 3399.10 3402.80 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 640 0.0 0.0 0.0
1979 6394 0.0 0.0 0.0
1980 8560 0.0 0.0 0.0
1981 5462 0.0 0.0 0.0
1982 5580 0.0 0.0 0.0
1983 5104 0.0 0.0 0.0
1984 3870 0.0 0.0 0.0
1985 3680 0.0 0.0 0.0
1986 905 0.0 0.0 0.0
1987 645 0.0 0.0 0.0
1988 528 0.0 0.0 0.0
1993 3596 0.0 0.0 0.0
1994 8452 0.0 0.0 0.0
1995 7990 0.0 0.0 0.0
1996 7697 0.0 0.0 0.0
1997 7338 0.0 0.0 0.0
1998 8200 0.0 0.0 0.0
1999 8185 0.0 0.0 0.0
2000 6631 0.0 0.0 0.0
2001 7019 0.0 0.0 0.0
2002 92 0.0 0.0 0.0
2012 440 0.0 0.0 0.0
2013 4632 0.0 0.0 0.0
2014 1342 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-06-20 Lost Circulation 1014.30 1014.30
1977-11-11 Lost Circulation 3508.90 3508.90
2014-09-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References