X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265053116000

Well Details

Well ID: 0265053116000
Loading map...
Location: 00/16-31-026-05W5/0
Location Alias: 00/16-31-26-05 W5M
Location Alias 2: 00/16-31-026-05 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 05
Section: 31
County/Municipality: Rocky View County
Well Name: Canlin WCATH 16-31-26-5
Operator Name: Canlin Energy Corporation
License Number: 0034050
License Date: 1968-04-30
License Status: Issued
Spud Date: 1968-05-04
Final Drill Date: 1968-07-01
Well Total Depth: 3139.40 m
Surface Hole Latitude: 51.269015
Surface Hole Longitude: -114.681368

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-04-30 Obtained License
1968-05-04 Direction Drilling Operation Performed - 98
1968-07-01 Finished Drilling
1968-07-01 Well Mode changed to Drilled and Cased
1968-07-04 Production Casing Operation Performed
1968-07-07 Perforation Treatment Performed - Selective Jet Perforations
1968-10-05 Well Began Production
1968-10-05 Well Fluid changed to Gas
1968-10-05 Well Mode changed to Flowing
1971-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1968-05-04 2960.20 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-07-07 Selective Jet Perforations 3023.00 3024.20 0
1968-07-07 Selective Jet Perforations 3096.80 3098.30 0
1968-07-07 Selective Jet Perforations 3100.40 3103.80 0
1971-10-20 Acid Treatment 3023.00 3103.80 0
1968-07-07 Selective Jet Perforations 3036.40 3037.60 0
1968-07-07 Selective Jet Perforations 3039.50 3048.90 0
1968-07-07 Selective Jet Perforations 3061.70 3066.00 0
1968-07-07 Selective Jet Perforations 3066.90 3070.60 0
1968-07-07 Selective Jet Perforations 3075.40 3079.70 0
1968-07-07 Selective Jet Perforations 3082.70 3084.30 0
1968-07-07 Selective Jet Perforations 3085.80 3089.10 0
1968-07-07 Selective Jet Perforations 3090.40 3094.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 7293 0.0 0.0 0.0
1970 7889 0.0 0.0 0.0
1971 8518 0.0 0.0 0.0
1972 8378 0.0 0.0 0.0
1973 8322 0.0 0.0 0.0
1974 8527 0.0 0.0 0.0
1975 8552 0.0 0.0 0.0
1976 8283 0.0 0.0 0.0
1977 7864 0.0 0.0 0.0
1978 8521 0.0 0.0 0.0
1979 8721 0.0 0.0 0.0
1980 7526 0.0 0.0 0.0
1981 5752 0.0 0.0 0.0
1982 4801 0.0 0.0 0.0
1983 5364 0.0 0.0 0.0
1984 5235 0.0 0.0 0.0
1985 2648 0.0 0.0 0.0
1986 1291 0.0 0.0 0.0
1987 7936 0.0 0.0 0.0
1988 8038 0.0 0.0 0.0
1989 6895 0.0 0.0 0.0
1990 7963 0.0 0.0 0.0
1991 6120 0.0 0.0 0.0
1992 8020 0.0 0.0 0.0
1993 8155 0.0 0.0 0.0
1994 8709 0.0 0.0 0.0
1995 8369 0.0 0.0 0.0
1996 8780 0.0 0.0 0.0
1997 8635 0.0 0.0 0.0
1998 7938 0.0 0.0 0.0
1999 5657 0.0 0.0 0.0
2000 8737 0.0 0.0 0.0
2001 8206 0.0 0.0 0.0
2002 8633 0.0 0.0 0.0
2003 8707 0.0 0.0 0.0
2004 8695 0.0 0.0 0.0
2005 7970 0.0 0.0 0.0
2006 8748 0.0 0.0 0.0
2007 8484 0.0 0.0 0.0
2008 8766 0.0 0.0 0.0
2009 8285 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8675 0.0 0.0 0.0
2012 8760 0.0 0.0 0.0
2013 7944 0.0 0.0 0.0
2014 8684 0.0 0.0 0.0
2015 8681 0.0 0.0 0.0
2016 8684 0.0 0.0 0.0
2017 8562 0.0 0.0 0.0
2018 7737 0.0 0.0 0.0
2019 6797 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References