X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265050315000

Well Details

Well ID: 0265050315000
Loading map...
Location: 00/15-03-026-05W5/0
Location Alias: 00/15-03-26-05 W5M
Location Alias 2: 00/15-03-026-05 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 05
Section: 03
County/Municipality: Stoney 142, 143, 144
Well Name: SHELL JUMPING POUND UNIT NO. 10
Operator Name: Shell Canada Limited
License Number: 0005839
License Date: 1952-12-19
License Status: Issued
Spud Date: 1953-01-31
Final Drill Date: 1953-05-29
Well Total Depth: 2923.60 m
Surface Hole Latitude: 51.192438
Surface Hole Longitude: -114.620663

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-19 Obtained License
1953-05-19 Drill Stem Test Performed
1953-05-25 Drill Stem Test Performed
1953-05-29 Finished Drilling
1953-05-29 Well Mode changed to Drilled and Cased
1953-06-01 Drill Stem Test Performed
1953-06-06 Perforation Treatment Performed - Bullet Perforation
1953-06-06 Production Casing Operation Performed
1953-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-09-24 Well Began Production
1954-09-24 Well Fluid changed to Gas
1954-09-24 Well Mode changed to Flowing
1989-09-13 Perforation Treatment Performed - Jet Perforation
1989-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-06 Bullet Perforation 2872.40 2874.30 13
1989-09-18 Acid Treatment 2843.80 2872.00 0
1953-06-06 Bullet Perforation 2868.20 2870.00 13
1953-06-06 Bullet Perforation 2846.80 2849.90 13
1953-06-06 Bullet Perforation 2851.70 2854.50 13
1953-06-06 Bullet Perforation 2856.60 2858.40 13
1953-06-06 Bullet Perforation 2860.20 2865.70 13
1953-06-07 Acid Treatment 2846.80 2874.30 0
1953-06-25 Acid Treatment 2843.80 2923.60 0
1989-09-13 Perforation 2847.00 2872.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 8225 0.0 0.0 0.0
1970 8575 0.0 0.0 0.0
1971 7613 0.0 0.0 0.0
1972 8609 0.0 0.0 0.0
1973 7999 0.0 0.0 0.0
1974 8517 0.0 0.0 0.0
1975 8382 0.0 0.0 0.0
1976 7205 0.0 0.0 0.0
1977 8653 0.0 0.0 0.0
1978 8662 0.0 0.0 0.0
1979 8632 0.0 0.0 0.0
1980 8516 0.0 0.0 0.0
1981 8072 0.0 0.0 0.0
1982 8635 0.0 0.0 0.0
1983 8543 0.0 0.0 0.0
1984 8718 0.0 0.0 0.0
1985 8306 0.0 0.0 0.0
1986 2217 0.0 0.0 0.0
1989 2427 0.0 0.0 0.0
1990 8121 0.0 0.0 0.0
1991 8117 0.0 0.0 0.0
1992 6951 0.0 0.0 0.0
1993 8389 0.0 0.0 0.0
1994 8687 0.0 0.0 0.0
1995 8626 0.0 0.0 0.0
1996 8597 0.0 0.0 0.0
1997 8107 0.0 0.0 0.0
1998 8415 0.0 0.0 0.0
1999 8210 0.0 0.0 0.0
2000 8045 0.0 0.0 0.0
2001 8556 0.0 0.0 0.0
2002 8659 0.0 0.0 0.0
2003 7774 0.0 0.0 0.0
2004 8709 0.0 0.0 0.0
2005 8084 0.0 0.0 0.0
2006 8676 0.0 0.0 0.0
2007 8685 0.0 0.0 0.0
2008 7890 0.0 0.0 0.0
2009 6213 0.0 0.0 0.0
2010 8429 0.0 0.0 0.0
2011 8349 0.0 0.0 0.0
2012 7178 0.0 0.0 0.0
2013 7772 0.0 0.0 0.0
2014 7552 0.0 0.0 0.0
2015 8141 0.0 0.0 0.0
2016 8383 0.0 0.0 0.0
2017 7860 0.0 0.0 0.0
2018 8208 0.0 0.0 0.0
2019 8355 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References