If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265033102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.27175,"lon":-114.397696,"icon":""}]} |
Location: 00/02-31-026-03W5/0 | |
Location Alias: 00/02-31-26-03 W5M | |
Location Alias 2: 00/02-31-026-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 03 | |
Section: 31 | |
County/Municipality: Rocky View County | |
Well Name: TRIOIL HZ COCHRANE 2-31-26-3 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0446374 | |
License Date: 2012-06-08 | |
License Status: Issued | |
Spud Date: 2012-06-22 | |
Final Drill Date: 2012-07-06 | |
Well Total Depth: 3968.00 m | |
Surface Hole Latitude: 51.271750 | |
Surface Hole Longitude: -114.397696 |
Date | Event |
---|---|
2012-06-08 | Obtained License |
2012-06-25 | Surface Casing Operation Performed |
2012-06-25 | Well Log Performed |
2012-06-28 | Direction Drilling Operation Performed - Deviate |
2012-06-30 | Direction Drilling Operation Performed - Horizontal |
2012-07-06 | Finished Drilling |
2012-07-06 | Well Mode changed to Drilled and Cased |
2012-07-10 | Liner Casing Operation Performed |
2012-07-10 | Production Casing Operation Performed |
2012-07-12 | Rig Released |
2012-08-02 | Well Log Performed |
2012-08-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-07 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-15 | Well Began Production |
2012-08-15 | Well Fluid changed to Crude Oil |
2012-08-15 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-22 | Ensign Drilling Inc. | 530 | N/A | Drill To LD |
2012-06-22 | Ensign Drilling Inc. | 530 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-28 | 2040.55 | Deviate (5 - 79 degrees) |
2012-06-30 | 2456.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-07 | Open Hole/Barefoot Completion | 3928.90 | 3968.00 | 0 |
2012-08-07 | Multi-Stage Fracture | 3304.40 | 3304.50 | 0 |
2012-08-08 | Multi-Stage Fracture | 3224.40 | 3224.50 | 0 |
2012-08-08 | Multi-Stage Fracture | 3146.60 | 3146.70 | 0 |
2012-08-08 | Multi-Stage Fracture | 3066.60 | 3066.70 | 0 |
2012-08-08 | Multi-Stage Fracture | 2987.90 | 2988.00 | 0 |
2012-08-08 | Multi-Stage Fracture | 2908.30 | 2908.40 | 0 |
2012-08-08 | Multi-Stage Fracture | 2827.90 | 2828.00 | 0 |
2012-08-08 | Multi-Stage Fracture | 2748.00 | 2748.10 | 0 |
2012-08-08 | Multi-Stage Fracture | 2667.60 | 2667.70 | 0 |
2012-08-08 | Multi-Stage Fracture | 2588.00 | 2588.10 | 0 |
2012-08-07 | Multi-Stage Fracture | 3924.20 | 3924.30 | 0 |
2012-08-07 | Multi-Stage Fracture | 3855.80 | 3855.90 | 0 |
2012-08-07 | Multi-Stage Fracture | 3780.10 | 3780.20 | 0 |
2012-08-07 | Multi-Stage Fracture | 3700.20 | 3700.30 | 0 |
2012-08-07 | Multi-Stage Fracture | 3623.60 | 3623.70 | 0 |
2012-08-07 | Multi-Stage Fracture | 3543.90 | 3544.00 | 0 |
2012-08-07 | Multi-Stage Fracture | 3463.90 | 3464.00 | 0 |
2012-08-07 | Multi-Stage Fracture | 3384.90 | 3385.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2154 | 0.0 | 0.0 | 0.0 |
2013 | 7559 | 0.0 | 0.0 | 0.0 |
2014 | 7370 | 0.0 | 0.0 | 0.0 |
2015 | 8425 | 0.0 | 0.0 | 0.0 |
2016 | 8741 | 0.0 | 0.0 | 0.0 |
2017 | 8664 | 0.0 | 0.0 | 0.0 |
2018 | 8600 | 0.0 | 0.0 | 0.0 |
2019 | 8628 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-12 | No Incident Encountered | 0.00 | 0.00 |
2012-08-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]