If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264282704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.247328,"lon":-113.828444,"icon":""}]} |
Location: 00/04-27-026-28W4/0 | |
Location Alias: 00/04-27-26-28 W4M | |
Location Alias 2: 00/04-27-026-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 28 | |
Section: 27 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 4-27-26-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410517 | |
License Date: 2009-05-15 | |
License Status: Amended | |
Spud Date: 2009-12-17 | |
Final Drill Date: 2009-12-19 | |
Well Total Depth: 1402.00 m | |
Surface Hole Latitude: 51.247328 | |
Surface Hole Longitude: -113.828444 |
Date | Event |
---|---|
2009-05-15 | Obtained License |
2009-12-17 | Direction Drilling Operation Performed - Deviate |
2009-12-17 | Surface Casing Operation Performed |
2009-12-19 | Finished Drilling |
2009-12-19 | Production Casing Operation Performed |
2009-12-19 | Rig Released |
2009-12-19 | Well Mode changed to Drilled and Cased |
2009-12-23 | Well Log Performed |
2012-01-11 | Perforation Treatment Performed - Jet Perforation |
2012-02-01 | Perforation Treatment Performed - Fractured |
2012-02-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-04 | Well Mode changed to Testing |
2012-02-12 | Perforation Treatment Performed - Jet Perforation |
2012-02-13 | Perforation Treatment Performed - Fractured |
2012-03-11 | Well Began Production |
2012-03-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-11 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-17 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-11 | Perforation | 1190.00 | 1192.00 | 13 |
2012-02-12 | Perforation | 666.90 | 667.40 | 13 |
2012-02-12 | Perforation | 673.70 | 674.20 | 13 |
2012-02-12 | Perforation | 732.80 | 733.30 | 13 |
2012-02-12 | Perforation | 805.00 | 806.00 | 13 |
2012-02-12 | Perforation | 806.50 | 807.00 | 13 |
2012-02-12 | Perforation | 815.80 | 816.30 | 13 |
2012-02-12 | Perforation | 834.60 | 835.10 | 13 |
2012-02-12 | Perforation | 842.50 | 844.50 | 13 |
2012-02-12 | Perforation | 847.00 | 847.50 | 13 |
2012-02-12 | Perforation | 893.80 | 894.80 | 13 |
2012-01-11 | Perforation | 1227.00 | 1229.00 | 13 |
2012-02-12 | Perforation | 900.90 | 901.40 | 13 |
2012-02-12 | Perforation | 903.40 | 905.40 | 13 |
2012-02-12 | Perforation | 923.00 | 925.00 | 13 |
2012-02-12 | Perforation | 925.80 | 926.30 | 13 |
2012-02-12 | Perforation | 932.60 | 933.10 | 13 |
2012-02-12 | Perforation | 940.50 | 941.00 | 13 |
2012-02-12 | Perforation | 957.20 | 957.70 | 13 |
2012-02-12 | Perforation | 959.40 | 959.90 | 13 |
2012-02-12 | Perforation | 966.60 | 967.10 | 13 |
2012-02-12 | Perforation | 970.60 | 971.10 | 13 |
2012-01-11 | Perforation | 1301.00 | 1303.00 | 13 |
2012-02-12 | Perforation | 988.50 | 989.50 | 13 |
2012-02-12 | Perforation | 990.20 | 990.70 | 13 |
2012-02-12 | Perforation | 991.80 | 992.30 | 13 |
2012-02-12 | Perforation | 1000.80 | 1001.30 | 13 |
2012-02-12 | Perforation | 1006.20 | 1006.70 | 13 |
2012-02-13 | Fracture | 497.60 | 1006.70 | 0 |
2012-02-01 | Fracture | 1190.00 | 1192.00 | 0 |
2012-02-01 | Fracture | 1227.00 | 1229.00 | 0 |
2012-02-01 | Fracture | 1301.00 | 1303.00 | 0 |
2012-02-12 | Perforation | 497.60 | 498.10 | 13 |
2012-02-12 | Perforation | 601.00 | 603.00 | 13 |
2012-02-12 | Perforation | 633.20 | 633.70 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7180 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[6]