X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264280908000

Well Details

Well ID: 0264280908000
Loading map...
Location: 00/08-09-026-28W4/0
Location Alias: 00/08-09-26-28 W4M
Location Alias 2: 00/08-09-026-28 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 28
Section: 09
County/Municipality: Rocky View County
Well Name: WASCANA HZT CROSSFIELD 10-10-26-28
Operator Name: CNOOC Petroleum North America ULC
License Number: 0082110
License Date: 1980-04-11
License Status: Abandoned
Spud Date: 1980-09-07
Final Drill Date: 1980-10-05
Well Total Depth: 2566.00 m
Surface Hole Latitude: 51.202167
Surface Hole Longitude: -113.842990

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-11 Obtained License
1980-10-05 Finished Drilling
1980-10-05 Well Log Performed
1980-10-07 Production Casing Operation Performed
1981-02-27 Perforation Treatment Performed - Jet Perforation
1981-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-10 Well Mode changed to Drilled and Cased
1981-08-01 Well Began Production
1981-08-01 Well Fluid changed to Gas
1981-08-01 Well Mode changed to Flowing
1982-07-27 Perforation Treatment Performed - Fractured
1988-12-15 Perforation Treatment Performed - Fractured
1998-06-10 Perforation Treatment Performed - Bridge Plug No Cement Required
1998-06-10 Well Fluid changed to Gas
1998-06-10 Well Mode changed to Abandoned and Whipstocked
2009-09-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-27 Perforation 2534.50 2541.50 7
1981-02-28 Acid Treatment 2534.50 2541.50 0
1982-07-27 Fracture 2534.50 2541.50 0
1988-12-15 Fracture 2534.50 2541.50 0
1998-06-10 Bridge Plug, No Cement 2468.00 2468.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3647 0.0 0.0 0.0
1982 6551 0.0 0.0 0.0
1983 8500 0.0 0.0 0.0
1984 8262 0.0 0.0 0.0
1985 8692 0.0 0.0 0.0
1986 8488 0.0 0.0 0.0
1987 8531 0.0 0.0 0.0
1988 7982 0.0 0.0 0.0
1989 8376 0.0 0.0 0.0
1990 3443 0.0 0.0 0.0
1991 7997 0.0 0.0 0.0
1992 7948 0.0 0.0 0.0
1993 8186 0.0 0.0 0.0
1994 8240 0.0 0.0 0.0
1995 8713 0.0 0.0 0.0
1996 7224 0.0 0.0 0.0
1997 1891 0.0 0.0 0.0

For data sources see[5]

References