X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264271409000

Well Details

Well ID: 0264271409000
Loading map...
Location: 00/09-14-026-27W4/0
Location Alias: 00/09-14-26-27 W4M
Location Alias 2: 00/09-14-026-27 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 27
Section: 14
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-14-26-27
Operator Name: Ember Resources Inc.
License Number: 0223124
License Date: 1999-05-21
License Status: Issued
Spud Date: 1999-05-30
Final Drill Date: 2001-04-27
Well Total Depth: 1104.00 m
Surface Hole Latitude: 51.220174
Surface Hole Longitude: -113.656803

For data sources see[1][2]

Well History

Date Event
1999-05-21 Obtained License
1999-05-30 Surface Casing Operation Performed
2001-04-27 Finished Drilling
2001-04-28 Production Casing Operation Performed
2001-04-28 Rig Released
2001-04-28 Well Mode changed to Drilled and Cased
2001-05-10 Well Log Performed
2001-05-26 Perforation Treatment Performed - Jet Perforation
2001-06-14 Well Began Production
2001-06-14 Well Fluid changed to Gas
2001-06-14 Well Mode changed to Flowing
2001-06-27 Perforation Treatment Performed - Fractured
2005-09-04 Perforation Treatment Performed - Jet Perforation
2005-10-27 Perforation Treatment Performed - Fractured
2006-09-01 Well Fluid changed to Gas
2006-09-01 Well Mode changed to Suspended
2007-08-02 Well Log Performed
2007-10-11 Well Log Performed
2008-08-13 Well Log Performed
2009-09-25 Well Log Performed
2010-12-03 Well Log Performed
2013-10-08 Well Log Performed
2017-04-12 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-05-26 Perforation 959.00 961.00 17
2005-09-04 Perforation 676.80 677.30 13
2005-09-04 Perforation 673.60 674.10 13
2005-09-04 Perforation 662.60 663.10 13
2005-09-04 Perforation 649.60 650.10 13
2005-09-04 Perforation 641.50 642.00 13
2005-09-04 Perforation 632.90 633.40 13
2005-09-04 Perforation 624.30 624.80 13
2005-09-04 Perforation 606.40 606.90 13
2005-09-04 Perforation 595.60 596.10 13
2005-09-04 Perforation 579.70 580.20 13
2001-05-26 Perforation 953.00 957.00 17
2005-09-04 Perforation 570.00 570.50 13
2005-09-04 Perforation 561.60 562.10 13
2005-09-04 Perforation 550.40 550.90 13
2005-09-04 Perforation 543.30 543.80 13
2005-09-04 Perforation 539.20 539.70 13
2005-09-04 Perforation 535.00 535.50 13
2005-09-04 Perforation 528.40 528.90 13
2005-09-04 Perforation 525.80 526.30 13
2005-09-04 Perforation 521.30 521.80 13
2005-09-04 Perforation 476.10 476.60 13
2001-05-26 Perforation 793.50 795.50 17
2005-09-04 Perforation 459.20 459.70 13
2005-09-04 Perforation 412.60 413.10 13
2005-09-04 Perforation 404.60 405.10 13
2005-09-04 Perforation 400.90 401.40 13
2005-09-04 Perforation 393.00 393.50 13
2005-09-04 Perforation 388.30 388.80 13
2005-09-04 Perforation 330.10 330.60 13
2005-10-27 Fracture 330.10 721.60 0
2001-06-27 Fracture 793.50 961.00 0
2005-09-04 Perforation 721.10 721.60 13
2005-09-04 Perforation 709.40 709.90 13
2005-09-04 Perforation 706.40 706.90 13
2005-09-04 Perforation 689.00 689.50 13
2005-09-04 Perforation 681.80 682.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4313 0.0 0.0 0.0
2002 8700 0.0 0.0 0.0
2003 8623 0.0 0.0 0.0
2004 8757 0.0 0.0 0.0
2005 5353 0.0 0.0 0.0

For data sources see[5]

References