X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264270804000

Well Details

Well ID: 0264270804000
Loading map...
Location: 00/04-08-026-27W4/0
Location Alias: 00/04-08-26-27 W4M
Location Alias 2: 00/04-08-026-27 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 27
Section: 08
County/Municipality: Rocky View County
Well Name: PW GAS ARDEN 4-8-26-27
Operator Name: TAQA North Ltd.
License Number: 0236912
License Date: 2000-05-08
License Status: RecCertified
Spud Date: 2000-05-25
Final Drill Date: 2000-06-12
Well Total Depth: 2432.00 m
Surface Hole Latitude: 51.198927
Surface Hole Longitude: -113.747053

For data sources see[1][2]

Well History

Date Event
2000-05-08 Obtained License
2000-05-27 Surface Casing Operation Performed
2000-06-12 Finished Drilling
2000-06-12 Well Log Performed
2000-06-14 Well Log Performed
2000-06-15 Well Log Performed
2000-06-16 Well Log Performed
2000-06-19 Production Casing Operation Performed
2000-06-21 Rig Released
2000-06-21 Well Mode changed to Drilled and Cased
2000-07-03 Perforation Treatment Performed - Jet Perforation
2000-07-03 Well Log Performed
2000-07-04 Perforation Treatment Performed - Cement Squeeze
2000-07-04 Perforation Treatment Performed - Jet Perforation
2000-07-04 Well Log Performed
2000-07-06 Perforation Treatment Performed - Casing Patch (Over Perfs)
2000-07-08 Well Log Performed
2000-07-09 Perforation Treatment Performed - Jet Perforation
2000-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-13 Perforation Treatment Performed - Fractured
2000-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-24 Plug Back Performed
2000-09-24 Well Mode changed to Abandoned Zone
2000-09-25 Well Log Performed
2000-09-26 Perforation Treatment Performed - Jet Perforation
2000-09-26 Well Log Performed
2000-09-28 Perforation Treatment Performed - Fractured
2003-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-07 Plug Back Performed
2003-03-07 Well Log Performed
2003-03-08 Perforation Treatment Performed - Jet Perforation
2003-03-08 Well Log Performed
2003-03-11 Perforation Treatment Performed - Cement Squeeze
2003-03-11 Plug Back Performed
2003-03-12 Perforation Treatment Performed - Jet Perforation
2003-03-12 Well Log Performed
2003-03-13 Perforation Treatment Performed - Cement Squeeze
2003-03-13 Plug Back Performed
2003-03-14 Perforation Treatment Performed - Jet Perforation
2003-03-14 Well Log Performed
2003-03-15 Perforation Treatment Performed - Cement Squeeze
2003-03-15 Plug Back Performed
2003-03-16 Perforation Treatment Performed - Jet Perforation
2003-03-16 Well Log Performed
2003-03-17 Perforation Treatment Performed - Cement Squeeze
2003-03-17 Plug Back Performed
2003-03-18 Perforation Treatment Performed - Jet Perforation
2003-03-18 Well Log Performed
2003-03-19 Perforation Treatment Performed - Cement Squeeze
2003-03-19 Plug Back Performed
2003-03-20 Perforation Treatment Performed - Jet Perforation
2003-03-20 Well Log Performed
2003-03-21 Perforation Treatment Performed - Cement Squeeze
2003-03-21 Plug Back Performed
2003-08-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-07-03 Perforation 449.50 450.50 18
2000-09-26 Perforation 1732.50 1736.50 17
2000-09-28 Fracture 1732.50 1736.50 0
2003-03-07 Packing Device Capped w/Cement 1717.00 1725.00 0
2003-03-08 Perforation 1278.00 1280.00 14
2003-03-11 Cement Squeeze 1278.00 1280.00 0
2003-03-12 Perforation 1129.00 1130.00 15
2003-03-13 Cement Squeeze 1129.00 1130.00 0
2003-03-14 Perforation 860.00 861.00 15
2003-03-15 Cement Squeeze 860.00 861.00 0
2003-03-16 Perforation 716.00 717.00 15
2000-07-04 Perforation 410.50 411.50 18
2003-03-17 Cement Squeeze 716.00 717.00 0
2003-03-18 Perforation 581.00 582.00 15
2003-03-19 Cement Squeeze 581.00 582.00 0
2003-03-20 Perforation 416.00 417.00 15
2003-03-21 Cement Squeeze 416.00 417.00 0
2000-07-04 Cement Squeeze 410.50 411.50 0
2000-07-06 Casing Patch 447.70 452.30 0
2000-07-06 Casing Patch 408.70 413.20 0
2000-07-09 Perforation 2391.00 2399.00 10
2000-07-10 Acid Treatment 2391.00 2399.00 0
2000-07-13 Fracture 2391.00 2399.00 0
2000-09-24 Packing Device Capped w/Cement 2375.00 2383.10 0

For data sources see[4]



References