If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264262006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.232154,"lon":-113.602962,"icon":""}]} |
Location: 00/06-20-026-26W4/0 | |
Location Alias: 00/06-20-26-26 W4M | |
Location Alias 2: 00/06-20-026-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 20 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 6-20-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0329024 | |
License Date: 2005-04-08 | |
License Status: Issued | |
Spud Date: 2005-04-29 | |
Final Drill Date: 2005-05-11 | |
Well Total Depth: 1067.00 m | |
Surface Hole Latitude: 51.232154 | |
Surface Hole Longitude: -113.602962 |
Date | Event |
---|---|
2005-04-08 | Obtained License |
2005-04-29 | Surface Casing Operation Performed |
2005-05-11 | Finished Drilling |
2005-05-11 | Production Casing Operation Performed |
2005-05-11 | Rig Released |
2005-05-11 | Well Mode changed to Drilled and Cased |
2005-05-20 | Well Log Performed |
2005-05-31 | Perforation Treatment Performed - Jet Perforation |
2005-05-31 | Well Log Performed |
2005-07-20 | Perforation Treatment Performed - Fractured |
2011-02-03 | Perforation Treatment Performed - Jet Perforation |
2011-02-12 | Perforation Treatment Performed - Fractured |
2011-07-11 | Well Began Production |
2011-07-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-07-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-05-31 | Perforation | 941.30 | 942.30 | 17 |
2005-07-20 | Fracture | 565.50 | 567.00 | 0 |
2005-07-20 | Fracture | 471.50 | 476.50 | 0 |
2011-02-03 | Perforation | 383.00 | 384.50 | 13 |
2011-02-03 | Perforation | 430.60 | 431.10 | 13 |
2011-02-03 | Perforation | 365.40 | 366.40 | 13 |
2011-02-03 | Perforation | 375.90 | 376.40 | 13 |
2011-02-03 | Perforation | 493.60 | 494.10 | 13 |
2011-02-03 | Perforation | 497.10 | 497.60 | 13 |
2011-02-03 | Perforation | 484.00 | 484.50 | 13 |
2011-02-03 | Perforation | 490.20 | 491.20 | 13 |
2005-05-31 | Perforation | 742.30 | 743.80 | 17 |
2011-02-03 | Perforation | 305.00 | 306.00 | 13 |
2011-02-03 | Perforation | 373.00 | 375.00 | 13 |
2011-02-03 | Perforation | 261.00 | 263.00 | 13 |
2011-02-03 | Perforation | 270.00 | 272.00 | 13 |
2011-02-03 | Perforation | 445.00 | 447.00 | 13 |
2011-02-03 | Perforation | 344.10 | 344.60 | 13 |
2011-02-03 | Perforation | 402.00 | 404.00 | 13 |
2011-02-03 | Perforation | 416.00 | 418.00 | 13 |
2011-02-03 | Perforation | 503.20 | 503.70 | 13 |
2011-02-03 | Perforation | 689.60 | 690.10 | 13 |
2005-05-31 | Perforation | 606.50 | 608.50 | 17 |
2011-02-03 | Perforation | 631.00 | 632.50 | 13 |
2011-02-03 | Perforation | 623.40 | 624.40 | 13 |
2011-02-03 | Perforation | 680.20 | 680.70 | 13 |
2011-02-03 | Perforation | 650.80 | 651.80 | 13 |
2011-02-03 | Perforation | 669.60 | 670.60 | 13 |
2011-02-03 | Perforation | 635.10 | 636.10 | 13 |
2011-02-03 | Perforation | 642.70 | 644.20 | 13 |
2011-02-03 | Perforation | 553.60 | 555.60 | 13 |
2011-02-03 | Perforation | 560.50 | 561.00 | 13 |
2011-02-03 | Perforation | 540.20 | 541.20 | 13 |
2005-05-31 | Perforation | 587.50 | 590.50 | 17 |
2011-02-03 | Perforation | 506.70 | 507.20 | 13 |
2011-02-03 | Perforation | 513.70 | 514.20 | 13 |
2011-02-03 | Perforation | 597.90 | 598.90 | 13 |
2011-02-03 | Perforation | 609.10 | 610.10 | 13 |
2011-02-03 | Perforation | 620.50 | 621.00 | 13 |
2011-02-12 | Fracture | 261.00 | 306.00 | 0 |
2011-02-12 | Fracture | 445.00 | 447.00 | 0 |
2011-02-12 | Fracture | 402.00 | 418.00 | 0 |
2011-02-12 | Fracture | 373.00 | 375.00 | 0 |
2011-02-12 | Fracture | 490.20 | 651.80 | 0 |
2005-05-31 | Perforation | 587.50 | 590.50 | 17 |
2011-02-12 | Fracture | 669.60 | 690.10 | 0 |
2011-02-12 | Fracture | 430.60 | 431.10 | 0 |
2011-02-12 | Fracture | 344.10 | 366.40 | 0 |
2011-02-12 | Fracture | 375.90 | 384.50 | 0 |
2005-05-31 | Perforation | 565.50 | 567.00 | 17 |
2005-05-31 | Perforation | 471.50 | 476.50 | 17 |
2005-07-20 | Fracture | 742.30 | 743.80 | 0 |
2005-07-20 | Fracture | 587.50 | 590.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 4172 | 0.0 | 0.0 | 0.0 |
2012 | 3659 | 0.0 | 0.0 | 0.0 |
2013 | 7463 | 0.0 | 0.0 | 0.0 |
2014 | 8557 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8767 | 0.0 | 0.0 | 0.0 |
2017 | 8571 | 0.0 | 0.0 | 0.0 |
2018 | 8119 | 0.0 | 0.0 | 0.0 |
2019 | 8225 | 0.0 | 0.0 | 0.0 |
2020 | 2080 | 0.0 | 0.0 | 0.0 |
For data sources see[5]