If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264253604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.258427,"lon":-113.373241,"icon":""}]} |
Location: 00/04-36-026-25W4/0 | |
Location Alias: 00/04-36-26-25 W4M | |
Location Alias 2: 00/04-36-026-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 36 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 4-36-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0334667 | |
License Date: 2005-07-15 | |
License Status: Issued | |
Spud Date: 2005-10-12 | |
Final Drill Date: 2005-10-17 | |
Well Total Depth: 763.00 m | |
Surface Hole Latitude: 51.258427 | |
Surface Hole Longitude: -113.373241 |
Date | Event |
---|---|
2005-07-15 | Obtained License |
2005-10-12 | Surface Casing Operation Performed |
2005-10-17 | Finished Drilling |
2005-10-17 | Production Casing Operation Performed |
2005-10-17 | Rig Released |
2005-10-17 | Well Mode changed to Drilled and Cased |
2005-10-20 | Well Log Performed |
2005-10-30 | Perforation Treatment Performed - Jet Perforation |
2005-11-10 | Well Fluid changed to Gas |
2005-11-10 | Well Mode changed to Testing |
2005-11-17 | Perforation Treatment Performed - Jet Perforation |
2005-12-30 | Perforation Treatment Performed - Jet Perforation |
2006-01-08 | Perforation Treatment Performed - Fractured |
2006-02-01 | Well Began Production |
2006-02-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-10-30 | Perforation | 652.00 | 653.00 | 13 |
2005-12-30 | Perforation | 506.60 | 507.10 | 13 |
2005-12-30 | Perforation | 505.60 | 506.10 | 13 |
2005-12-30 | Perforation | 500.70 | 501.20 | 13 |
2005-12-30 | Perforation | 468.70 | 469.20 | 13 |
2005-12-30 | Perforation | 467.20 | 467.70 | 13 |
2005-12-30 | Perforation | 459.90 | 460.40 | 13 |
2005-12-30 | Perforation | 455.70 | 456.20 | 13 |
2005-12-30 | Perforation | 454.30 | 454.80 | 13 |
2005-12-30 | Perforation | 452.80 | 453.30 | 13 |
2005-12-30 | Perforation | 446.30 | 446.80 | 13 |
2005-11-17 | Perforation | 516.50 | 518.50 | 13 |
2005-12-30 | Perforation | 437.70 | 438.20 | 13 |
2005-12-30 | Perforation | 436.80 | 437.30 | 13 |
2005-12-30 | Perforation | 429.60 | 430.10 | 13 |
2005-12-30 | Perforation | 426.50 | 427.00 | 13 |
2005-12-30 | Perforation | 425.40 | 425.90 | 13 |
2005-12-30 | Perforation | 415.50 | 416.00 | 13 |
2005-12-30 | Perforation | 410.30 | 410.80 | 13 |
2005-12-30 | Perforation | 406.10 | 406.60 | 13 |
2005-12-30 | Perforation | 404.40 | 404.90 | 13 |
2005-12-30 | Perforation | 403.50 | 404.00 | 13 |
2005-12-30 | Perforation | 583.50 | 584.00 | 13 |
2005-12-30 | Perforation | 393.50 | 394.00 | 13 |
2005-12-30 | Perforation | 308.90 | 309.40 | 13 |
2005-12-30 | Perforation | 304.40 | 304.90 | 13 |
2005-12-30 | Perforation | 292.30 | 292.80 | 13 |
2005-12-30 | Perforation | 286.70 | 287.20 | 13 |
2005-12-30 | Perforation | 285.10 | 285.60 | 13 |
2006-01-08 | Fracture | 285.10 | 584.00 | 0 |
2005-12-30 | Perforation | 578.40 | 578.90 | 13 |
2005-12-30 | Perforation | 541.20 | 541.70 | 13 |
2005-12-30 | Perforation | 537.40 | 537.90 | 13 |
2005-12-30 | Perforation | 533.30 | 534.30 | 13 |
2005-12-30 | Perforation | 523.90 | 524.40 | 13 |
2005-12-30 | Perforation | 509.40 | 509.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 48 | 0.0 | 0.0 | 0.0 |
2006 | 7959 | 0.0 | 0.0 | 0.0 |
2007 | 6938 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8719 | 0.0 | 0.0 | 0.0 |
2012 | 3291 | 0.0 | 0.0 | 0.0 |
2013 | 8758 | 0.0 | 0.0 | 0.0 |
2014 | 8719 | 0.0 | 0.0 | 0.0 |
2015 | 8718 | 0.0 | 0.0 | 0.0 |
2016 | 8704 | 0.0 | 0.0 | 0.0 |
2017 | 8599 | 0.0 | 0.0 | 0.0 |
2018 | 8708 | 0.0 | 0.0 | 0.0 |
2019 | 8717 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]