X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264253604000

Well Details

Well ID: 0264253604000
Loading map...
Location: 00/04-36-026-25W4/0
Location Alias: 00/04-36-26-25 W4M
Location Alias 2: 00/04-36-026-25 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 36
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 4-36-26-25
Operator Name: Ember Resources Inc.
License Number: 0334667
License Date: 2005-07-15
License Status: Issued
Spud Date: 2005-10-12
Final Drill Date: 2005-10-17
Well Total Depth: 763.00 m
Surface Hole Latitude: 51.258427
Surface Hole Longitude: -113.373241

For data sources see[1][2]

Well History

Date Event
2005-07-15 Obtained License
2005-10-12 Surface Casing Operation Performed
2005-10-17 Finished Drilling
2005-10-17 Production Casing Operation Performed
2005-10-17 Rig Released
2005-10-17 Well Mode changed to Drilled and Cased
2005-10-20 Well Log Performed
2005-10-30 Perforation Treatment Performed - Jet Perforation
2005-11-10 Well Fluid changed to Gas
2005-11-10 Well Mode changed to Testing
2005-11-17 Perforation Treatment Performed - Jet Perforation
2005-12-30 Perforation Treatment Performed - Jet Perforation
2006-01-08 Perforation Treatment Performed - Fractured
2006-02-01 Well Began Production
2006-02-01 Well Fluid changed to Coalbed Methane-Coals and Other
2006-02-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-30 Perforation 652.00 653.00 13
2005-12-30 Perforation 506.60 507.10 13
2005-12-30 Perforation 505.60 506.10 13
2005-12-30 Perforation 500.70 501.20 13
2005-12-30 Perforation 468.70 469.20 13
2005-12-30 Perforation 467.20 467.70 13
2005-12-30 Perforation 459.90 460.40 13
2005-12-30 Perforation 455.70 456.20 13
2005-12-30 Perforation 454.30 454.80 13
2005-12-30 Perforation 452.80 453.30 13
2005-12-30 Perforation 446.30 446.80 13
2005-11-17 Perforation 516.50 518.50 13
2005-12-30 Perforation 437.70 438.20 13
2005-12-30 Perforation 436.80 437.30 13
2005-12-30 Perforation 429.60 430.10 13
2005-12-30 Perforation 426.50 427.00 13
2005-12-30 Perforation 425.40 425.90 13
2005-12-30 Perforation 415.50 416.00 13
2005-12-30 Perforation 410.30 410.80 13
2005-12-30 Perforation 406.10 406.60 13
2005-12-30 Perforation 404.40 404.90 13
2005-12-30 Perforation 403.50 404.00 13
2005-12-30 Perforation 583.50 584.00 13
2005-12-30 Perforation 393.50 394.00 13
2005-12-30 Perforation 308.90 309.40 13
2005-12-30 Perforation 304.40 304.90 13
2005-12-30 Perforation 292.30 292.80 13
2005-12-30 Perforation 286.70 287.20 13
2005-12-30 Perforation 285.10 285.60 13
2006-01-08 Fracture 285.10 584.00 0
2005-12-30 Perforation 578.40 578.90 13
2005-12-30 Perforation 541.20 541.70 13
2005-12-30 Perforation 537.40 537.90 13
2005-12-30 Perforation 533.30 534.30 13
2005-12-30 Perforation 523.90 524.40 13
2005-12-30 Perforation 509.40 509.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 48 0.0 0.0 0.0
2006 7959 0.0 0.0 0.0
2007 6938 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8719 0.0 0.0 0.0
2012 3291 0.0 0.0 0.0
2013 8758 0.0 0.0 0.0
2014 8719 0.0 0.0 0.0
2015 8718 0.0 0.0 0.0
2016 8704 0.0 0.0 0.0
2017 8599 0.0 0.0 0.0
2018 8708 0.0 0.0 0.0
2019 8717 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[5]

References