X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264252303000

Well Details

Well ID: 0264252303000
Loading map...
Location: 00/03-23-026-25W4/0
Location Alias: 00/03-23-26-25 W4M
Location Alias 2: 00/03-23-026-25 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 23
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-23-26-25
Operator Name: Ember Resources Inc.
License Number: 0341968
License Date: 2005-11-04
License Status: Amended
Spud Date: 2006-01-25
Final Drill Date: 2006-01-28
Well Total Depth: 755.00 m
Surface Hole Latitude: 51.229309
Surface Hole Longitude: -113.393074

For data sources see[1][2]

Well History

Date Event
2005-11-04 Obtained License
2006-01-25 Surface Casing Operation Performed
2006-01-28 Finished Drilling
2006-01-28 Production Casing Operation Performed
2006-01-28 Rig Released
2006-01-28 Well Mode changed to Drilled and Cased
2006-02-02 Well Log Performed
2006-02-19 Perforation Treatment Performed - Jet Perforation
2006-02-23 Perforation Treatment Performed - Fractured
2006-08-10 Well Began Production
2006-08-10 Well Fluid changed to Coalbed Methane-Coals Only
2006-08-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-19 Perforation 586.70 587.20 13
2006-02-19 Perforation 514.50 515.00 13
2006-02-19 Perforation 469.00 471.00 13
2006-02-19 Perforation 450.30 450.80 13
2006-02-19 Perforation 447.20 448.20 13
2006-02-19 Perforation 442.30 442.80 13
2006-02-19 Perforation 430.80 431.30 13
2006-02-19 Perforation 427.30 427.60 13
2006-02-19 Perforation 425.60 426.10 13
2006-02-19 Perforation 423.00 423.50 13
2006-02-19 Perforation 407.60 408.10 13
2006-02-19 Perforation 583.60 584.10 13
2006-02-19 Perforation 404.90 405.40 13
2006-02-19 Perforation 402.60 403.60 13
2006-02-19 Perforation 343.00 343.50 13
2006-02-19 Perforation 308.80 309.30 13
2006-02-19 Perforation 303.50 304.00 13
2006-02-19 Perforation 288.20 288.70 13
2006-02-19 Perforation 283.20 283.70 13
2006-02-19 Perforation 280.80 281.30 13
2006-02-19 Perforation 274.70 275.20 13
2006-02-19 Perforation 224.70 225.20 13
2006-02-19 Perforation 580.40 580.90 13
2006-02-19 Perforation 202.50 203.00 13
2006-02-23 Fracture 202.50 587.20 0
2006-02-19 Perforation 576.80 577.30 13
2006-02-19 Perforation 543.40 543.90 13
2006-02-19 Perforation 541.70 542.20 13
2006-02-19 Perforation 534.20 534.70 13
2006-02-19 Perforation 527.90 528.40 13
2006-02-19 Perforation 518.00 518.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3450 0.0 0.0 0.0
2007 6489 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8726 0.0 0.0 0.0
2012 3543 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8716 0.0 0.0 0.0
2015 8510 0.0 0.0 0.0
2016 8553 0.0 0.0 0.0
2017 8507 0.0 0.0 0.0
2018 8230 0.0 0.0 0.0
2019 8036 0.0 0.0 0.0
2020 2061 0.0 0.0 0.0

For data sources see[5]

References