If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264252206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.233028,"lon":-113.412404,"icon":""}]} |
Location: 00/06-22-026-25W4/2 | |
Location Alias: 00/06-22-26-25 W4M | |
Location Alias 2: 00/06-22-026-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 22 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 6-22-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0354597 | |
License Date: 2006-03-22 | |
License Status: Amended | |
Spud Date: 2006-05-15 | |
Final Drill Date: 2006-05-19 | |
Well Total Depth: 983.00 m | |
Surface Hole Latitude: 51.233028 | |
Surface Hole Longitude: -113.412404 |
Date | Event |
---|---|
2006-03-22 | Obtained License |
2006-05-15 | Surface Casing Operation Performed |
2006-05-19 | Finished Drilling |
2006-05-19 | Production Casing Operation Performed |
2006-05-19 | Rig Released |
2006-05-19 | Well Mode changed to Drilled and Cased |
2006-05-22 | Well Log Performed |
2006-07-02 | Perforation Treatment Performed - Jet Perforation |
2006-09-29 | Perforation Treatment Performed - Jet Perforation |
2006-10-04 | Perforation Treatment Performed - Fractured |
2006-10-15 | Well Began Production |
2006-10-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-10-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-07-02 | Perforation | 508.00 | 511.00 | 13 |
2006-09-29 | Perforation | 541.90 | 542.40 | 13 |
2006-09-29 | Perforation | 533.40 | 533.90 | 13 |
2006-09-29 | Perforation | 529.90 | 530.40 | 13 |
2006-09-29 | Perforation | 484.90 | 485.40 | 13 |
2006-09-29 | Perforation | 483.30 | 483.80 | 13 |
2006-09-29 | Perforation | 475.50 | 476.00 | 13 |
2006-09-29 | Perforation | 465.40 | 465.90 | 13 |
2006-09-29 | Perforation | 464.50 | 465.00 | 13 |
2006-09-29 | Perforation | 461.50 | 462.00 | 13 |
2006-09-29 | Perforation | 458.20 | 458.70 | 13 |
2006-09-29 | Perforation | 612.40 | 612.90 | 13 |
2006-09-29 | Perforation | 446.50 | 447.00 | 13 |
2006-09-29 | Perforation | 441.40 | 441.90 | 13 |
2006-09-29 | Perforation | 438.60 | 439.10 | 13 |
2006-09-29 | Perforation | 436.40 | 436.90 | 13 |
2006-09-29 | Perforation | 417.90 | 418.40 | 13 |
2006-09-29 | Perforation | 416.40 | 416.90 | 13 |
2006-09-29 | Perforation | 371.90 | 372.40 | 13 |
2006-09-29 | Perforation | 362.70 | 363.20 | 13 |
2006-09-29 | Perforation | 357.80 | 358.30 | 13 |
2006-09-29 | Perforation | 330.60 | 331.10 | 13 |
2006-09-29 | Perforation | 596.20 | 596.70 | 13 |
2006-09-29 | Perforation | 327.60 | 328.10 | 13 |
2006-09-29 | Perforation | 321.30 | 321.80 | 13 |
2006-09-29 | Perforation | 313.60 | 314.10 | 13 |
2006-09-29 | Perforation | 298.60 | 299.10 | 13 |
2006-09-29 | Perforation | 294.70 | 295.20 | 13 |
2006-09-29 | Perforation | 292.60 | 293.10 | 13 |
2006-09-29 | Perforation | 236.30 | 236.80 | 13 |
2006-10-04 | Fracture | 236.30 | 612.90 | 0 |
2006-09-29 | Perforation | 593.80 | 594.30 | 13 |
2006-09-29 | Perforation | 591.40 | 591.90 | 13 |
2006-09-29 | Perforation | 587.80 | 588.30 | 13 |
2006-09-29 | Perforation | 556.80 | 557.30 | 13 |
2006-09-29 | Perforation | 555.10 | 555.60 | 13 |
2006-09-29 | Perforation | 548.00 | 548.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1865 | 0.0 | 0.0 | 0.0 |
2007 | 6489 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8726 | 0.0 | 0.0 | 0.0 |
2012 | 5007 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8510 | 0.0 | 0.0 | 0.0 |
2016 | 8553 | 0.0 | 0.0 | 0.0 |
2017 | 8507 | 0.0 | 0.0 | 0.0 |
2018 | 8230 | 0.0 | 0.0 | 0.0 |
2019 | 8036 | 0.0 | 0.0 | 0.0 |
2020 | 2061 | 0.0 | 0.0 | 0.0 |
For data sources see[5]