If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264252116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.239503,"lon":-113.427903,"icon":""}]} |
Location: 00/16-21-026-25W4/0 | |
Location Alias: 00/16-21-26-25 W4M | |
Location Alias 2: 00/16-21-026-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 21 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 16-21-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0349859 | |
License Date: 2006-01-23 | |
License Status: Issued | |
Spud Date: 2006-01-26 | |
Final Drill Date: 2006-01-30 | |
Well Total Depth: 789.00 m | |
Surface Hole Latitude: 51.239503 | |
Surface Hole Longitude: -113.427903 |
Date | Event |
---|---|
2006-01-23 | Obtained License |
2006-01-26 | Surface Casing Operation Performed |
2006-01-30 | Finished Drilling |
2006-01-30 | Well Mode changed to Drilled and Cased |
2006-01-31 | Production Casing Operation Performed |
2006-01-31 | Rig Released |
2006-02-03 | Well Log Performed |
2006-02-19 | Perforation Treatment Performed - Jet Perforation |
2006-03-08 | Perforation Treatment Performed - Jet Perforation |
2006-08-10 | Well Began Production |
2006-08-10 | Well Fluid changed to Gas |
2006-08-10 | Well Mode changed to Flowing |
2007-08-22 | Perforation Treatment Performed - Jet Perforation |
2007-08-26 | Perforation Treatment Performed - Fractured |
2007-09-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-09-07 | Well Mode changed to Flowing |
2011-03-08 | Perforation Treatment Performed - Jet Perforation |
2011-04-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-16 | Well Mode changed to Flowing |
2011-08-11 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-19 | Perforation | 669.50 | 672.50 | 13 |
2007-08-22 | Perforation | 554.50 | 555.50 | 13 |
2007-08-22 | Perforation | 548.00 | 549.00 | 13 |
2007-08-22 | Perforation | 541.40 | 542.40 | 13 |
2007-08-22 | Perforation | 530.10 | 530.60 | 13 |
2007-08-22 | Perforation | 526.00 | 527.00 | 13 |
2007-08-22 | Perforation | 481.90 | 484.90 | 13 |
2007-08-22 | Perforation | 465.70 | 466.70 | 13 |
2007-08-22 | Perforation | 461.70 | 462.20 | 13 |
2007-08-22 | Perforation | 443.00 | 443.50 | 13 |
2007-08-22 | Perforation | 438.00 | 438.50 | 13 |
2006-03-08 | Perforation | 663.50 | 665.50 | 13 |
2007-08-22 | Perforation | 434.10 | 434.60 | 13 |
2007-08-22 | Perforation | 416.10 | 417.10 | 13 |
2007-08-22 | Perforation | 412.20 | 412.70 | 13 |
2007-08-22 | Perforation | 371.20 | 371.70 | 13 |
2007-08-22 | Perforation | 358.60 | 359.10 | 13 |
2007-08-22 | Perforation | 316.50 | 317.00 | 13 |
2007-08-22 | Perforation | 301.20 | 301.70 | 13 |
2007-08-22 | Perforation | 296.90 | 297.40 | 13 |
2007-08-22 | Perforation | 239.40 | 239.90 | 13 |
2007-08-26 | Fracture | 239.40 | 596.90 | 0 |
2006-03-08 | Perforation | 653.50 | 656.50 | 13 |
2011-03-08 | Perforation | 515.00 | 517.00 | 13 |
2011-03-08 | Perforation | 507.00 | 509.00 | 13 |
2011-03-08 | Perforation | 422.00 | 424.00 | 13 |
2011-03-08 | Perforation | 392.00 | 395.00 | 13 |
2011-03-08 | Perforation | 387.00 | 389.00 | 13 |
2011-03-08 | Perforation | 335.00 | 336.00 | 13 |
2011-03-08 | Perforation | 320.00 | 323.00 | 13 |
2011-03-08 | Perforation | 311.00 | 314.00 | 13 |
2011-03-08 | Perforation | 268.00 | 271.00 | 13 |
2011-03-08 | Perforation | 215.00 | 218.00 | 13 |
2007-08-22 | Perforation | 596.40 | 596.90 | 13 |
2011-03-08 | Perforation | 195.00 | 197.00 | 13 |
2011-03-08 | Perforation | 185.00 | 187.00 | 13 |
2011-08-11 | Fracture | 215.00 | 596.90 | 0 |
2007-08-22 | Perforation | 595.50 | 596.00 | 13 |
2007-08-22 | Perforation | 594.20 | 594.70 | 13 |
2007-08-22 | Perforation | 590.50 | 591.50 | 13 |
2007-08-22 | Perforation | 572.80 | 573.30 | 13 |
2007-08-22 | Perforation | 557.70 | 558.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3450 | 0.0 | 0.0 | 0.0 |
2007 | 6489 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8733 | 0.0 | 0.0 | 0.0 |
2012 | 5007 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8510 | 0.0 | 0.0 | 0.0 |
2016 | 8553 | 0.0 | 0.0 | 0.0 |
2017 | 8507 | 0.0 | 0.0 | 0.0 |
2018 | 8230 | 0.0 | 0.0 | 0.0 |
2019 | 8036 | 0.0 | 0.0 | 0.0 |
2020 | 2061 | 0.0 | 0.0 | 0.0 |
For data sources see[5]