If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264251801002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.212885,"lon":-113.475633,"icon":""}]} |
Location: 00/01-18-026-25W4/2 | |
Location Alias: 00/01-18-26-25 W4M | |
Location Alias 2: 00/01-18-026-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 18 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 1-18-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0377434 | |
License Date: 2007-05-24 | |
License Status: Issued | |
Spud Date: 2007-09-01 | |
Final Drill Date: 2007-09-11 | |
Well Total Depth: 753.00 m | |
Surface Hole Latitude: 51.212885 | |
Surface Hole Longitude: -113.475633 |
Date | Event |
---|---|
2007-05-24 | Obtained License |
2007-09-01 | Surface Casing Operation Performed |
2007-09-11 | Finished Drilling |
2007-09-11 | Production Casing Operation Performed |
2007-09-11 | Rig Released |
2007-09-11 | Well Mode changed to Drilled and Cased |
2007-09-22 | Well Log Performed |
2007-10-06 | Perforation Treatment Performed - Jet Perforation |
2007-10-13 | Perforation Treatment Performed - Jet Perforation |
2007-10-18 | Perforation Treatment Performed - Jet Perforation |
2007-10-28 | Perforation Treatment Performed - Fractured |
2007-11-19 | Well Began Production |
2007-11-19 | Well Fluid changed to Gas |
2007-11-19 | Well Mode changed to Flowing |
2008-08-19 | Perforation Treatment Performed - Jet Perforation |
2008-08-25 | Perforation Treatment Performed - Fractured |
2008-09-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-09-12 | Well Mode changed to Flowing |
2017-03-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-10-06 | Perforation | 702.00 | 705.00 | 13 |
2008-08-19 | Perforation | 573.50 | 574.00 | 13 |
2008-08-19 | Perforation | 555.10 | 556.10 | 13 |
2008-08-19 | Perforation | 548.70 | 549.20 | 13 |
2008-08-19 | Perforation | 533.70 | 534.20 | 13 |
2008-08-19 | Perforation | 514.70 | 515.70 | 13 |
2008-08-19 | Perforation | 506.90 | 507.40 | 13 |
2008-08-19 | Perforation | 505.50 | 506.50 | 13 |
2008-08-19 | Perforation | 492.70 | 493.70 | 13 |
2008-08-19 | Perforation | 489.10 | 489.60 | 13 |
2008-08-19 | Perforation | 456.20 | 456.70 | 13 |
2007-10-13 | Perforation | 692.00 | 695.00 | 13 |
2008-08-19 | Perforation | 454.90 | 455.40 | 13 |
2008-08-19 | Perforation | 444.30 | 444.80 | 13 |
2008-08-19 | Perforation | 441.70 | 442.20 | 13 |
2008-08-19 | Perforation | 335.30 | 335.80 | 13 |
2008-08-19 | Perforation | 320.90 | 321.40 | 13 |
2008-08-25 | Fracture | 320.90 | 624.00 | 0 |
2007-10-18 | Perforation | 683.00 | 685.00 | 13 |
2007-10-28 | Fracture | 683.00 | 685.00 | 0 |
2008-08-19 | Perforation | 623.50 | 624.00 | 13 |
2008-08-19 | Perforation | 619.80 | 620.30 | 13 |
2008-08-19 | Perforation | 587.80 | 588.30 | 13 |
2008-08-19 | Perforation | 586.50 | 587.00 | 13 |
2008-08-19 | Perforation | 578.60 | 579.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 793 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8726 | 0.0 | 0.0 | 0.0 |
2012 | 5007 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8510 | 0.0 | 0.0 | 0.0 |
2016 | 8553 | 0.0 | 0.0 | 0.0 |
2017 | 8507 | 0.0 | 0.0 | 0.0 |
2018 | 8237 | 0.0 | 0.0 | 0.0 |
2019 | 8036 | 0.0 | 0.0 | 0.0 |
2020 | 2061 | 0.0 | 0.0 | 0.0 |
For data sources see[5]