If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264251609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.221805,"lon":-113.424161,"icon":""}]} |
Location: 00/09-16-026-25W4/0 | |
Location Alias: 00/09-16-26-25 W4M | |
Location Alias 2: 00/09-16-026-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 16 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 9-16-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0238761 | |
License Date: 2000-06-20 | |
License Status: Amended | |
Spud Date: 2000-06-27 | |
Final Drill Date: 2000-06-29 | |
Well Total Depth: 1005.00 m | |
Surface Hole Latitude: 51.221805 | |
Surface Hole Longitude: -113.424161 |
Date | Event |
---|---|
2000-06-20 | Obtained License |
2000-06-28 | Surface Casing Operation Performed |
2000-06-29 | Finished Drilling |
2000-06-29 | Production Casing Operation Performed |
2000-06-29 | Rig Released |
2000-06-29 | Well Mode changed to Drilled and Cased |
2000-07-11 | Well Log Performed |
2000-07-25 | Perforation Treatment Performed - Jet Perforation |
2000-08-20 | Perforation Treatment Performed - Fractured |
2000-08-28 | Perforation Treatment Performed - Jet Perforation |
2000-12-21 | Well Began Production |
2000-12-21 | Well Fluid changed to Gas |
2000-12-21 | Well Mode changed to Flowing |
2004-08-12 | Perforation Treatment Performed - Fractured |
2006-03-09 | Perforation Treatment Performed - Jet Perforation |
2006-03-13 | Perforation Treatment Performed - Fractured |
2006-04-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-04-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-07-25 | Perforation | 852.50 | 855.50 | 7 |
2006-03-09 | Perforation | 599.40 | 599.90 | 13 |
2006-03-09 | Perforation | 596.00 | 596.50 | 13 |
2006-03-09 | Perforation | 595.00 | 595.50 | 13 |
2006-03-09 | Perforation | 563.50 | 564.00 | 13 |
2006-03-09 | Perforation | 562.00 | 562.50 | 13 |
2006-03-09 | Perforation | 553.80 | 554.80 | 13 |
2006-03-09 | Perforation | 547.80 | 548.30 | 13 |
2006-03-09 | Perforation | 539.10 | 539.60 | 13 |
2006-03-09 | Perforation | 534.80 | 535.80 | 13 |
2006-03-09 | Perforation | 528.50 | 529.00 | 13 |
2000-08-20 | Fracture | 852.50 | 855.50 | 0 |
2006-03-09 | Perforation | 493.10 | 493.60 | 13 |
2006-03-09 | Perforation | 491.70 | 492.20 | 13 |
2006-03-09 | Perforation | 482.80 | 483.30 | 13 |
2006-03-09 | Perforation | 473.60 | 474.60 | 13 |
2006-03-09 | Perforation | 470.30 | 471.30 | 13 |
2006-03-09 | Perforation | 451.40 | 451.90 | 13 |
2006-03-09 | Perforation | 448.00 | 448.50 | 13 |
2006-03-09 | Perforation | 441.70 | 442.20 | 13 |
2006-03-09 | Perforation | 439.60 | 440.10 | 13 |
2006-03-09 | Perforation | 427.30 | 428.30 | 13 |
2000-08-28 | Perforation | 663.00 | 667.00 | 7 |
2006-03-09 | Perforation | 424.80 | 425.30 | 13 |
2006-03-09 | Perforation | 421.60 | 422.10 | 13 |
2006-03-09 | Perforation | 377.40 | 377.90 | 13 |
2006-03-09 | Perforation | 367.40 | 367.90 | 13 |
2006-03-09 | Perforation | 363.70 | 364.20 | 13 |
2006-03-09 | Perforation | 341.20 | 341.70 | 13 |
2006-03-09 | Perforation | 333.80 | 334.30 | 13 |
2006-03-09 | Perforation | 331.60 | 332.10 | 13 |
2006-03-09 | Perforation | 329.10 | 329.60 | 13 |
2006-03-09 | Perforation | 317.90 | 318.40 | 13 |
2000-08-28 | Perforation | 656.00 | 659.00 | 7 |
2006-03-09 | Perforation | 300.70 | 301.20 | 13 |
2006-03-09 | Perforation | 297.60 | 298.10 | 13 |
2006-03-09 | Perforation | 289.50 | 290.00 | 13 |
2006-03-09 | Perforation | 232.90 | 233.40 | 13 |
2006-03-13 | Fracture | 232.90 | 619.70 | 0 |
2004-08-12 | Fracture | 663.00 | 667.00 | 0 |
2004-08-12 | Fracture | 656.00 | 659.00 | 0 |
2006-03-09 | Perforation | 619.20 | 619.70 | 13 |
2006-03-09 | Perforation | 604.40 | 604.90 | 13 |
2006-03-09 | Perforation | 601.70 | 602.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 239 | 0.0 | 0.0 | 0.0 |
2001 | 8597 | 0.0 | 0.0 | 0.0 |
2002 | 8578 | 0.0 | 0.0 | 0.0 |
2003 | 8137 | 0.0 | 0.0 | 0.0 |
2004 | 7354 | 0.0 | 0.0 | 0.0 |
2005 | 8455 | 0.0 | 0.0 | 0.0 |
2006 | 7887 | 0.0 | 0.0 | 0.0 |
2007 | 6489 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8726 | 0.0 | 0.0 | 0.0 |
2012 | 5007 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8510 | 0.0 | 0.0 | 0.0 |
2016 | 8553 | 0.0 | 0.0 | 0.0 |
2017 | 8060 | 0.0 | 0.0 | 0.0 |
2018 | 8230 | 0.0 | 0.0 | 0.0 |
2019 | 8036 | 0.0 | 0.0 | 0.0 |
2020 | 2061 | 0.0 | 0.0 | 0.0 |
For data sources see[5]