If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264251310003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.222536,"lon":-113.359992,"icon":""}]} |
Location: 00/10-13-026-25W4/3 | |
Location Alias: 00/10-13-26-25 W4M | |
Location Alias 2: 00/10-13-026-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 13 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-13-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0271178 | |
License Date: 2002-06-24 | |
License Status: Issued | |
Spud Date: 2002-06-29 | |
Final Drill Date: 2002-07-03 | |
Well Total Depth: 941.00 m | |
Surface Hole Latitude: 51.222536 | |
Surface Hole Longitude: -113.359992 |
Date | Event |
---|---|
2002-06-24 | Obtained License |
2002-06-29 | Surface Casing Operation Performed |
2002-07-03 | Finished Drilling |
2002-07-03 | Well Mode changed to Drilled and Cased |
2002-07-04 | Production Casing Operation Performed |
2002-07-04 | Rig Released |
2002-07-29 | Well Log Performed |
2002-09-04 | Perforation Treatment Performed - Jet Perforation |
2002-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-20 | Plug Back Performed |
2002-10-17 | Perforation Treatment Performed - Jet Perforation |
2002-11-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-11-10 | Plug Back Performed |
2002-12-03 | Perforation Treatment Performed - Jet Perforation |
2002-12-13 | Well Fluid changed to Gas |
2002-12-13 | Well Mode changed to Testing |
2003-01-08 | Perforation Treatment Performed - Fractured |
2003-01-26 | Perforation Treatment Performed - Jet Perforation |
2003-02-15 | Perforation Treatment Performed - Fractured |
2003-05-28 | Perforation Treatment Performed - Jet Perforation |
2004-10-15 | Well Began Production |
2004-10-15 | Well Fluid changed to Gas |
2004-10-15 | Well Mode changed to Flowing |
2005-08-30 | Perforation Treatment Performed - Jet Perforation |
2005-09-06 | Perforation Treatment Performed - Fractured |
2006-10-01 | Well Fluid changed to Gas |
2006-10-01 | Well Mode changed to Suspended |
2017-05-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-09-04 | Perforation | 835.50 | 837.50 | 13 |
2005-08-30 | Perforation | 557.60 | 558.10 | 13 |
2005-08-30 | Perforation | 554.50 | 555.00 | 13 |
2005-08-30 | Perforation | 523.30 | 523.80 | 13 |
2005-08-30 | Perforation | 522.00 | 522.50 | 13 |
2005-08-30 | Perforation | 516.60 | 517.10 | 13 |
2005-08-30 | Perforation | 510.90 | 511.40 | 13 |
2005-08-30 | Perforation | 501.20 | 501.70 | 13 |
2005-08-30 | Perforation | 497.00 | 497.50 | 13 |
2005-08-30 | Perforation | 488.80 | 489.30 | 13 |
2005-08-30 | Perforation | 442.30 | 442.80 | 13 |
2002-09-20 | Packing Device Capped w/Cement | 817.00 | 825.00 | 0 |
2005-08-30 | Perforation | 432.50 | 433.00 | 13 |
2005-08-30 | Perforation | 429.80 | 430.40 | 13 |
2005-08-30 | Perforation | 420.70 | 421.20 | 13 |
2005-08-30 | Perforation | 410.40 | 410.90 | 13 |
2005-08-30 | Perforation | 407.70 | 408.70 | 13 |
2005-08-30 | Perforation | 402.20 | 402.70 | 13 |
2005-08-30 | Perforation | 399.80 | 400.30 | 13 |
2005-08-30 | Perforation | 388.30 | 388.80 | 13 |
2005-08-30 | Perforation | 383.30 | 383.80 | 13 |
2005-08-30 | Perforation | 380.10 | 380.60 | 13 |
2002-10-17 | Perforation | 794.00 | 796.00 | 7 |
2005-08-30 | Perforation | 339.50 | 340.00 | 13 |
2005-08-30 | Perforation | 324.40 | 324.90 | 13 |
2005-08-30 | Perforation | 289.50 | 290.00 | 13 |
2005-08-30 | Perforation | 284.60 | 285.10 | 13 |
2005-08-30 | Perforation | 279.30 | 279.80 | 13 |
2005-08-30 | Perforation | 276.20 | 276.70 | 13 |
2005-08-30 | Perforation | 272.80 | 273.30 | 13 |
2005-08-30 | Perforation | 266.70 | 267.20 | 13 |
2005-08-30 | Perforation | 206.90 | 207.40 | 13 |
2005-09-06 | Fracture | 206.90 | 558.10 | 0 |
2002-11-10 | Packing Device Capped w/Cement | 783.00 | 791.00 | 0 |
2002-12-03 | Perforation | 702.00 | 704.00 | 13 |
2003-01-08 | Fracture | 702.00 | 704.00 | 0 |
2003-01-26 | Perforation | 634.00 | 637.00 | 13 |
2003-02-15 | Fracture | 634.00 | 637.00 | 0 |
2003-05-28 | Perforation | 450.00 | 453.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 24 | 0.0 | 0.0 | 0.0 |
2004 | 1872 | 0.0 | 0.0 | 0.0 |
2005 | 4903 | 0.0 | 0.0 | 0.0 |
For data sources see[5]