X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264251105000

Well Details

Well ID: 0264251105000
Loading map...
Location: 00/05-11-026-25W4/0
Location Alias: 00/05-11-26-25 W4M
Location Alias 2: 00/05-11-026-25 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 11
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-11-26-25
Operator Name: Ember Resources Inc.
License Number: 0261325
License Date: 2001-11-02
License Status: Issued
Spud Date: 2001-11-13
Final Drill Date: 2001-11-15
Well Total Depth: 658.00 m
Surface Hole Latitude: 51.202361
Surface Hole Longitude: -113.399558

For data sources see[1][2]

Well History

Date Event
2001-11-02 Obtained License
2001-11-13 Conductor Casing Operation Performed
2001-11-15 Finished Drilling
2001-11-15 Lost Circulation Occurred
2001-11-15 Production Casing Operation Performed
2001-11-15 Rig Released
2001-11-15 Well Mode changed to Drilled and Cased
2001-11-25 Well Log Performed
2001-12-10 Perforation Treatment Performed - Jet Perforation
2001-12-11 Perforation Treatment Performed - Fractured
2002-02-10 Well Log Performed
2006-08-14 Well Began Production
2006-08-14 Well Fluid changed to Coalbed Methane-Coals Only
2006-08-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-12-10 Perforation 603.50 604.50 13
2001-12-10 Perforation 511.10 512.10 13
2001-12-10 Perforation 485.50 488.50 13
2001-12-10 Perforation 483.50 485.50 13
2001-12-10 Perforation 476.50 477.50 13
2001-12-10 Perforation 463.50 465.50 13
2001-12-10 Perforation 457.00 459.00 13
2001-12-10 Perforation 439.50 441.50 13
2001-12-10 Perforation 435.20 436.20 13
2001-12-10 Perforation 431.90 432.90 13
2001-12-10 Perforation 428.30 429.30 13
2001-12-10 Perforation 598.80 599.80 13
2001-12-10 Perforation 417.10 418.10 13
2001-12-10 Perforation 413.50 414.50 13
2001-12-10 Perforation 319.00 321.00 13
2001-12-10 Perforation 305.80 306.80 13
2001-12-10 Perforation 303.40 304.40 13
2001-12-10 Perforation 299.80 300.80 13
2001-12-10 Perforation 291.00 293.00 13
2001-12-10 Perforation 236.50 238.50 13
2001-12-11 Fracture 236.50 604.50 0
2001-12-10 Perforation 596.20 597.20 13
2001-12-10 Perforation 592.60 593.60 13
2001-12-10 Perforation 558.50 561.50 13
2001-12-10 Perforation 551.30 553.30 13
2001-12-10 Perforation 546.00 548.00 13
2001-12-10 Perforation 536.90 537.90 13
2001-12-10 Perforation 531.50 533.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3132 0.0 0.0 0.0
2007 7866 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8764 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8767 0.0 0.0 0.0
2017 8562 0.0 0.0 0.0
2018 8683 0.0 0.0 0.0
2019 8748 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-11-15 Lost Circulation 0.10 656.50

For data sources see[6]

References