If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264250605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.188852,"lon":-113.488534,"icon":""}]} |
Location: 00/05-06-026-25W4/0 | |
Location Alias: 00/05-06-26-25 W4M | |
Location Alias 2: 00/05-06-026-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-6-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0349862 | |
License Date: 2006-01-23 | |
License Status: Issued | |
Spud Date: 2006-02-10 | |
Final Drill Date: 2006-05-16 | |
Well Total Depth: 761.00 m | |
Surface Hole Latitude: 51.188852 | |
Surface Hole Longitude: -113.488534 |
Date | Event |
---|---|
2006-01-23 | Obtained License |
2006-02-10 | Surface Casing Operation Performed |
2006-05-16 | Finished Drilling |
2006-05-16 | Well Mode changed to Drilled and Cased |
2006-05-17 | Production Casing Operation Performed |
2006-05-17 | Rig Released |
2006-05-22 | Well Log Performed |
2006-08-28 | Perforation Treatment Performed - Jet Perforation |
2006-09-02 | Perforation Treatment Performed - Fractured |
2006-09-18 | Well Began Production |
2006-09-18 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-09-18 | Well Mode changed to Flowing |
2011-03-12 | Perforation Treatment Performed - Jet Perforation |
2011-05-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-05-10 | Well Mode changed to Flowing |
2011-09-22 | Perforation Treatment Performed - Fractured |
2011-11-18 | Perforation Treatment Performed - Fractured |
2011-11-29 | Perforation Treatment Performed - Fractured |
2011-12-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-08-28 | Perforation | 669.20 | 669.70 | 13 |
2006-08-28 | Perforation | 552.00 | 552.50 | 13 |
2006-08-28 | Perforation | 543.80 | 544.30 | 13 |
2006-08-28 | Perforation | 528.80 | 529.30 | 13 |
2006-08-28 | Perforation | 508.00 | 509.00 | 13 |
2006-08-28 | Perforation | 504.00 | 504.50 | 13 |
2006-08-28 | Perforation | 493.10 | 493.60 | 13 |
2006-08-28 | Perforation | 481.50 | 482.50 | 13 |
2006-08-28 | Perforation | 477.20 | 477.70 | 13 |
2006-08-28 | Perforation | 471.40 | 471.90 | 13 |
2006-08-28 | Perforation | 461.70 | 462.20 | 13 |
2006-08-28 | Perforation | 637.10 | 637.60 | 13 |
2006-08-28 | Perforation | 453.00 | 453.50 | 13 |
2006-08-28 | Perforation | 450.30 | 450.80 | 13 |
2006-08-28 | Perforation | 447.40 | 447.90 | 13 |
2006-08-28 | Perforation | 442.60 | 443.10 | 13 |
2006-08-28 | Perforation | 428.60 | 429.10 | 13 |
2006-08-28 | Perforation | 386.20 | 386.70 | 13 |
2006-08-28 | Perforation | 379.00 | 379.50 | 13 |
2006-08-28 | Perforation | 363.20 | 363.70 | 13 |
2006-08-28 | Perforation | 338.60 | 339.10 | 13 |
2006-08-28 | Perforation | 334.20 | 334.70 | 13 |
2006-08-28 | Perforation | 616.30 | 616.80 | 13 |
2006-08-28 | Perforation | 316.30 | 316.80 | 13 |
2006-08-28 | Perforation | 312.20 | 312.70 | 13 |
2006-08-28 | Perforation | 305.60 | 306.10 | 13 |
2006-08-28 | Perforation | 278.40 | 278.90 | 13 |
2006-09-02 | Fracture | 278.40 | 637.60 | 0 |
2011-03-12 | Perforation | 535.00 | 538.00 | 13 |
2011-03-12 | Perforation | 420.00 | 423.00 | 13 |
2011-03-12 | Perforation | 392.50 | 393.50 | 13 |
2011-03-12 | Perforation | 388.50 | 390.50 | 13 |
2011-03-12 | Perforation | 356.00 | 358.00 | 13 |
2006-08-28 | Perforation | 614.80 | 615.30 | 13 |
2011-03-12 | Perforation | 351.00 | 354.00 | 13 |
2011-03-12 | Perforation | 220.00 | 222.00 | 13 |
2011-03-12 | Perforation | 214.00 | 216.00 | 13 |
2011-09-22 | Fracture | 535.00 | 538.00 | 0 |
2011-11-18 | Fracture | 220.00 | 222.00 | 0 |
2011-11-18 | Fracture | 420.00 | 423.00 | 0 |
2011-11-29 | Fracture | 214.00 | 669.70 | 0 |
2006-08-28 | Perforation | 611.00 | 611.50 | 13 |
2006-08-28 | Perforation | 579.30 | 579.80 | 13 |
2006-08-28 | Perforation | 577.70 | 578.20 | 13 |
2006-08-28 | Perforation | 573.00 | 574.00 | 13 |
2006-08-28 | Perforation | 557.20 | 557.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 2510 | 0.0 | 0.0 | 0.0 |
2007 | 6489 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 7080 | 0.0 | 0.0 | 0.0 |
2012 | 8732 | 0.0 | 0.0 | 0.0 |
2013 | 8750 | 0.0 | 0.0 | 0.0 |
2014 | 8742 | 0.0 | 0.0 | 0.0 |
2015 | 8692 | 0.0 | 0.0 | 0.0 |
2016 | 8704 | 0.0 | 0.0 | 0.0 |
2017 | 8636 | 0.0 | 0.0 | 0.0 |
2018 | 8739 | 0.0 | 0.0 | 0.0 |
2019 | 8598 | 0.0 | 0.0 | 0.0 |
2020 | 2004 | 0.0 | 0.0 | 0.0 |
For data sources see[5]