If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264250102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.185312,"lon":-113.364163,"icon":""}]} |
Location: 00/02-01-026-25W4/0 | |
Location Alias: 00/02-01-26-25 W4M | |
Location Alias 2: 00/02-01-026-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 01 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 2-1-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0346607 | |
License Date: 2005-12-22 | |
License Status: Issued | |
Spud Date: 2006-01-04 | |
Final Drill Date: 2006-01-05 | |
Well Total Depth: 754.00 m | |
Surface Hole Latitude: 51.185312 | |
Surface Hole Longitude: -113.364163 |
Date | Event |
---|---|
2005-12-22 | Obtained License |
2006-01-04 | Surface Casing Operation Performed |
2006-01-05 | Finished Drilling |
2006-01-05 | Well Mode changed to Drilled and Cased |
2006-01-06 | Production Casing Operation Performed |
2006-01-06 | Rig Released |
2006-01-09 | Well Log Performed |
2006-01-27 | Perforation Treatment Performed - Jet Perforation |
2006-02-05 | Well Fluid changed to Gas |
2006-02-05 | Well Mode changed to Testing |
2006-02-19 | Perforation Treatment Performed - Jet Perforation |
2006-03-18 | Perforation Treatment Performed - Jet Perforation |
2006-07-15 | Perforation Treatment Performed - Fractured |
2006-08-04 | Well Began Production |
2006-08-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-08-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-27 | Perforation | 652.50 | 653.50 | 13 |
2006-03-18 | Perforation | 515.50 | 516.50 | 13 |
2006-03-18 | Perforation | 468.50 | 469.00 | 13 |
2006-03-18 | Perforation | 467.10 | 467.60 | 13 |
2006-03-18 | Perforation | 464.50 | 465.00 | 13 |
2006-03-18 | Perforation | 463.60 | 464.10 | 13 |
2006-03-18 | Perforation | 455.40 | 455.90 | 13 |
2006-03-18 | Perforation | 450.20 | 450.70 | 13 |
2006-03-18 | Perforation | 447.20 | 447.70 | 13 |
2006-03-18 | Perforation | 442.90 | 443.40 | 13 |
2006-03-18 | Perforation | 440.90 | 441.40 | 13 |
2006-02-19 | Perforation | 642.50 | 643.50 | 13 |
2006-03-18 | Perforation | 440.00 | 440.50 | 13 |
2006-03-18 | Perforation | 429.10 | 429.60 | 13 |
2006-03-18 | Perforation | 426.10 | 426.60 | 13 |
2006-03-18 | Perforation | 421.10 | 421.60 | 13 |
2006-03-18 | Perforation | 418.80 | 419.30 | 13 |
2006-03-18 | Perforation | 406.70 | 407.20 | 13 |
2006-03-18 | Perforation | 403.70 | 404.20 | 13 |
2006-03-18 | Perforation | 399.10 | 399.60 | 13 |
2006-03-18 | Perforation | 348.40 | 348.90 | 13 |
2006-03-18 | Perforation | 341.90 | 342.40 | 13 |
2006-03-18 | Perforation | 578.90 | 579.40 | 13 |
2006-03-18 | Perforation | 308.90 | 309.40 | 13 |
2006-03-18 | Perforation | 294.90 | 295.40 | 13 |
2006-03-18 | Perforation | 291.40 | 291.90 | 13 |
2006-03-18 | Perforation | 279.00 | 279.50 | 13 |
2006-03-18 | Perforation | 224.60 | 225.10 | 13 |
2006-07-15 | Fracture | 224.60 | 579.40 | 0 |
2006-03-18 | Perforation | 544.30 | 544.80 | 13 |
2006-03-18 | Perforation | 542.20 | 542.70 | 13 |
2006-03-18 | Perforation | 537.40 | 537.90 | 13 |
2006-03-18 | Perforation | 536.10 | 536.60 | 13 |
2006-03-18 | Perforation | 531.40 | 531.90 | 13 |
2006-03-18 | Perforation | 521.50 | 522.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3372 | 0.0 | 0.0 | 0.0 |
2007 | 7866 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8718 | 0.0 | 0.0 | 0.0 |
2012 | 4165 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8736 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8767 | 0.0 | 0.0 | 0.0 |
2017 | 8562 | 0.0 | 0.0 | 0.0 |
2018 | 8683 | 0.0 | 0.0 | 0.0 |
2019 | 8748 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]