If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264243515002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.26873,"lon":-113.243677,"icon":""}]} |
Location: 00/15-35-026-24W4/2 | |
Location Alias: 00/15-35-26-24 W4M | |
Location Alias 2: 00/15-35-026-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 15-35-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0308075 | |
License Date: 2004-05-05 | |
License Status: Issued | |
Spud Date: 2004-08-30 | |
Final Drill Date: 2004-09-02 | |
Well Total Depth: 937.00 m | |
Surface Hole Latitude: 51.268730 | |
Surface Hole Longitude: -113.243677 |
Date | Event |
---|---|
2004-05-05 | Obtained License |
2004-08-30 | Surface Casing Operation Performed |
2004-09-02 | Finished Drilling |
2004-09-02 | Production Casing Operation Performed |
2004-09-02 | Rig Released |
2004-09-02 | Well Mode changed to Drilled and Cased |
2004-09-13 | Well Log Performed |
2004-10-12 | Perforation Treatment Performed - Jet Perforation |
2004-10-27 | Perforation Treatment Performed - Fractured |
2004-11-05 | Perforation Treatment Performed - Jet Perforation |
2005-12-08 | Perforation Treatment Performed - Jet Perforation |
2005-12-14 | Perforation Treatment Performed - Fractured |
2005-12-21 | Well Began Production |
2005-12-21 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-12-21 | Well Mode changed to Flowing |
2017-04-24 | Well Fluid changed to Coalbed Methane-Coals Only |
2017-04-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-10-12 | Perforation | 840.00 | 843.00 | 14 |
2005-12-08 | Perforation | 489.00 | 489.50 | 13 |
2005-12-08 | Perforation | 488.20 | 488.70 | 13 |
2005-12-08 | Perforation | 482.00 | 482.50 | 13 |
2005-12-08 | Perforation | 436.80 | 437.30 | 13 |
2005-12-08 | Perforation | 429.70 | 430.20 | 13 |
2005-12-08 | Perforation | 428.70 | 429.20 | 13 |
2005-12-08 | Perforation | 423.90 | 424.40 | 13 |
2005-12-08 | Perforation | 422.60 | 423.10 | 13 |
2005-12-08 | Perforation | 420.30 | 420.80 | 13 |
2005-12-08 | Perforation | 415.90 | 416.40 | 13 |
2004-10-27 | Fracture | 840.00 | 843.00 | 0 |
2005-12-08 | Perforation | 397.50 | 398.00 | 13 |
2005-12-08 | Perforation | 396.20 | 396.70 | 13 |
2005-12-08 | Perforation | 392.30 | 392.80 | 13 |
2005-12-08 | Perforation | 391.40 | 391.90 | 13 |
2005-12-08 | Perforation | 378.80 | 379.30 | 13 |
2005-12-08 | Perforation | 375.80 | 376.30 | 13 |
2005-12-08 | Perforation | 373.60 | 374.10 | 13 |
2005-12-08 | Perforation | 283.20 | 283.70 | 13 |
2005-12-08 | Perforation | 277.20 | 277.70 | 13 |
2005-12-08 | Perforation | 260.20 | 260.70 | 13 |
2004-11-05 | Perforation | 822.00 | 827.00 | 14 |
2005-12-08 | Perforation | 253.60 | 254.10 | 13 |
2005-12-08 | Perforation | 200.50 | 201.00 | 13 |
2005-12-14 | Fracture | 200.50 | 547.90 | 0 |
2005-12-08 | Perforation | 547.40 | 547.90 | 13 |
2005-12-08 | Perforation | 545.60 | 546.10 | 13 |
2005-12-08 | Perforation | 516.20 | 516.70 | 13 |
2005-12-08 | Perforation | 514.50 | 515.00 | 13 |
2005-12-08 | Perforation | 498.50 | 499.00 | 13 |
2005-12-08 | Perforation | 492.50 | 493.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 264 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8559 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8602 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]