If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264243305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.261628,"lon":-113.304595,"icon":""}]} |
Location: 00/05-33-026-24W4/0 | |
Location Alias: 00/05-33-26-24 W4M | |
Location Alias 2: 00/05-33-026-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 33 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-33-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0333058 | |
License Date: 2005-06-16 | |
License Status: Issued | |
Spud Date: 2005-07-18 | |
Final Drill Date: 2005-07-28 | |
Well Total Depth: 729.00 m | |
Surface Hole Latitude: 51.261628 | |
Surface Hole Longitude: -113.304595 |
Date | Event |
---|---|
2005-06-16 | Obtained License |
2005-07-18 | Surface Casing Operation Performed |
2005-07-28 | Finished Drilling |
2005-07-28 | Well Mode changed to Drilled and Cased |
2005-07-29 | Production Casing Operation Performed |
2005-07-29 | Rig Released |
2005-08-01 | Well Log Performed |
2005-08-23 | Perforation Treatment Performed - Jet Perforation |
2005-09-28 | Perforation Treatment Performed - Fractured |
2005-10-17 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-10-17 | Well Mode changed to Testing |
2006-02-12 | Well Began Production |
2006-02-12 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-02-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-23 | Perforation | 549.20 | 549.70 | 13 |
2005-08-23 | Perforation | 471.90 | 472.40 | 13 |
2005-08-23 | Perforation | 468.70 | 469.70 | 13 |
2005-08-23 | Perforation | 461.60 | 462.10 | 13 |
2005-08-23 | Perforation | 418.20 | 418.70 | 13 |
2005-08-23 | Perforation | 416.70 | 417.20 | 13 |
2005-08-23 | Perforation | 414.40 | 414.90 | 13 |
2005-08-23 | Perforation | 413.50 | 414.00 | 13 |
2005-08-23 | Perforation | 412.00 | 412.50 | 13 |
2005-08-23 | Perforation | 402.90 | 403.40 | 13 |
2005-08-23 | Perforation | 401.10 | 401.60 | 13 |
2005-08-23 | Perforation | 536.10 | 536.60 | 13 |
2005-08-23 | Perforation | 399.70 | 400.20 | 13 |
2005-08-23 | Perforation | 396.70 | 397.20 | 13 |
2005-08-23 | Perforation | 388.90 | 389.40 | 13 |
2005-08-23 | Perforation | 388.10 | 388.60 | 13 |
2005-08-23 | Perforation | 379.80 | 380.30 | 13 |
2005-08-23 | Perforation | 378.50 | 379.00 | 13 |
2005-08-23 | Perforation | 376.90 | 377.40 | 13 |
2005-08-23 | Perforation | 374.90 | 375.40 | 13 |
2005-08-23 | Perforation | 373.40 | 373.90 | 13 |
2005-08-23 | Perforation | 363.50 | 364.00 | 13 |
2005-08-23 | Perforation | 532.70 | 533.70 | 13 |
2005-08-23 | Perforation | 360.20 | 360.70 | 13 |
2005-08-23 | Perforation | 356.90 | 357.40 | 13 |
2005-08-23 | Perforation | 355.90 | 356.40 | 13 |
2005-08-23 | Perforation | 354.00 | 354.50 | 13 |
2005-08-23 | Perforation | 303.30 | 304.30 | 13 |
2005-08-23 | Perforation | 297.90 | 298.40 | 13 |
2005-08-23 | Perforation | 271.00 | 271.50 | 13 |
2005-08-23 | Perforation | 267.60 | 268.10 | 13 |
2005-08-23 | Perforation | 260.20 | 260.70 | 13 |
2005-08-23 | Perforation | 250.90 | 251.40 | 13 |
2005-08-23 | Perforation | 524.00 | 524.50 | 13 |
2005-08-23 | Perforation | 248.40 | 248.90 | 13 |
2005-08-23 | Perforation | 183.20 | 183.70 | 13 |
2005-09-28 | Fracture | 183.20 | 549.70 | 0 |
2005-08-23 | Perforation | 495.30 | 495.80 | 13 |
2005-08-23 | Perforation | 494.10 | 494.60 | 13 |
2005-08-23 | Perforation | 488.80 | 489.30 | 13 |
2005-08-23 | Perforation | 486.90 | 487.40 | 13 |
2005-08-23 | Perforation | 478.60 | 479.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 48 | 0.0 | 0.0 | 0.0 |
2006 | 7742 | 0.0 | 0.0 | 0.0 |
2007 | 8559 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8602 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]