If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264243010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.25201,"lon":-113.338961,"icon":""}]} |
Location: 00/10-30-026-24W4/0 | |
Location Alias: 00/10-30-26-24 W4M | |
Location Alias 2: 00/10-30-026-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 30 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-30-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412793 | |
License Date: 2009-09-30 | |
License Status: Issued | |
Spud Date: 2010-01-27 | |
Final Drill Date: 2010-02-16 | |
Well Total Depth: 961.00 m | |
Surface Hole Latitude: 51.252010 | |
Surface Hole Longitude: -113.338961 |
Date | Event |
---|---|
2009-09-30 | Obtained License |
2010-01-28 | Surface Casing Operation Performed |
2010-02-16 | Finished Drilling |
2010-02-16 | Well Mode changed to Drilled and Cased |
2010-02-17 | Production Casing Operation Performed |
2010-02-17 | Rig Released |
2010-02-21 | Well Log Performed |
2010-05-15 | Perforation Treatment Performed - Jet Perforation |
2010-07-02 | Perforation Treatment Performed - Fractured |
2010-07-05 | Well Fluid changed to Gas |
2010-07-05 | Well Mode changed to Testing |
2010-07-21 | Perforation Treatment Performed - Jet Perforation |
2010-08-16 | Well Began Production |
2010-08-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-08-16 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-05-15 | Perforation | 695.00 | 697.00 | 13 |
2010-07-21 | Perforation | 463.70 | 466.70 | 13 |
2010-07-21 | Perforation | 458.80 | 459.30 | 13 |
2010-07-21 | Perforation | 454.20 | 454.70 | 13 |
2010-07-21 | Perforation | 451.10 | 452.10 | 13 |
2010-07-21 | Perforation | 436.70 | 437.70 | 13 |
2010-07-21 | Perforation | 428.60 | 429.10 | 13 |
2010-07-21 | Perforation | 426.00 | 427.00 | 13 |
2010-07-21 | Perforation | 422.70 | 423.70 | 13 |
2010-07-21 | Perforation | 416.00 | 416.50 | 13 |
2010-07-21 | Perforation | 411.20 | 411.70 | 13 |
2010-07-02 | Fracture | 695.00 | 697.00 | 0 |
2010-07-21 | Perforation | 402.60 | 403.10 | 13 |
2010-07-21 | Perforation | 302.70 | 303.20 | 13 |
2010-07-21 | Perforation | 288.60 | 289.10 | 13 |
2010-07-21 | Perforation | 285.20 | 286.20 | 13 |
2010-07-21 | Perforation | 281.40 | 281.90 | 13 |
2010-07-21 | Perforation | 469.00 | 471.00 | 13 |
2010-07-21 | Perforation | 406.00 | 408.00 | 13 |
2010-07-21 | Perforation | 393.00 | 395.00 | 13 |
2010-07-21 | Perforation | 379.00 | 381.00 | 13 |
2010-07-21 | Perforation | 374.00 | 377.00 | 13 |
2010-07-21 | Perforation | 570.40 | 570.90 | 13 |
2010-07-21 | Perforation | 365.00 | 366.00 | 13 |
2010-07-21 | Perforation | 318.00 | 320.00 | 13 |
2010-07-21 | Perforation | 295.00 | 298.00 | 13 |
2010-07-21 | Perforation | 273.00 | 275.00 | 13 |
2010-07-21 | Perforation | 248.00 | 250.00 | 13 |
2010-07-21 | Perforation | 240.00 | 242.00 | 13 |
2010-07-21 | Perforation | 231.00 | 233.00 | 13 |
2010-07-21 | Perforation | 220.00 | 223.00 | 13 |
2010-07-21 | Perforation | 217.00 | 218.00 | 13 |
2010-07-21 | Perforation | 190.00 | 192.00 | 13 |
2010-07-21 | Perforation | 539.00 | 539.50 | 13 |
2010-07-21 | Perforation | 534.60 | 535.10 | 13 |
2010-07-21 | Perforation | 525.70 | 526.70 | 13 |
2010-07-21 | Perforation | 516.60 | 517.60 | 13 |
2010-07-21 | Perforation | 513.70 | 514.70 | 13 |
2010-07-21 | Perforation | 507.10 | 507.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3312 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 5493 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8602 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]