If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264243003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.242302,"lon":-113.344586,"icon":""}]} |
Location: 00/03-30-026-24W4/0 | |
Location Alias: 00/03-30-26-24 W4M | |
Location Alias 2: 00/03-30-026-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 30 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 3-30-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0335791 | |
License Date: 2005-08-04 | |
License Status: Issued | |
Spud Date: 2005-08-22 | |
Final Drill Date: 2005-08-30 | |
Well Total Depth: 765.00 m | |
Surface Hole Latitude: 51.242302 | |
Surface Hole Longitude: -113.344586 |
Date | Event |
---|---|
2005-08-04 | Obtained License |
2005-08-23 | Surface Casing Operation Performed |
2005-08-30 | Finished Drilling |
2005-08-30 | Well Mode changed to Drilled and Cased |
2005-08-31 | Production Casing Operation Performed |
2005-08-31 | Rig Released |
2005-09-05 | Well Log Performed |
2005-09-21 | Perforation Treatment Performed - Jet Perforation |
2005-10-13 | Well Fluid changed to Gas |
2005-10-13 | Well Mode changed to Testing |
2005-11-15 | Perforation Treatment Performed - Jet Perforation |
2005-12-09 | Perforation Treatment Performed - Fractured |
2005-12-20 | Well Began Production |
2005-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-12-20 | Well Mode changed to Flowing |
2007-08-08 | Well Fluid changed to Gas |
2007-08-08 | Well Mode changed to Suspended |
2007-11-17 | Well Log Performed |
2008-08-15 | Well Log Performed |
2008-08-22 | Well Log Performed |
2009-10-25 | Well Log Performed |
2010-08-27 | Well Log Performed |
2017-05-01 | Well Structure changed to Commingled |
2018-12-19 | Perforation Treatment Performed - Jet Perforation |
2018-12-19 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-21 | Perforation | 659.00 | 662.00 | 13 |
2005-11-15 | Perforation | 513.50 | 514.00 | 13 |
2005-11-15 | Perforation | 472.40 | 474.40 | 13 |
2005-11-15 | Perforation | 466.80 | 467.30 | 13 |
2005-11-15 | Perforation | 451.10 | 451.60 | 13 |
2005-11-15 | Perforation | 449.60 | 450.10 | 13 |
2005-11-15 | Perforation | 442.00 | 442.50 | 13 |
2005-11-15 | Perforation | 433.30 | 433.80 | 13 |
2005-11-15 | Perforation | 431.20 | 432.20 | 13 |
2005-11-15 | Perforation | 427.60 | 428.60 | 13 |
2005-11-15 | Perforation | 412.20 | 412.70 | 13 |
2005-11-15 | Perforation | 599.20 | 599.70 | 13 |
2005-11-15 | Perforation | 409.40 | 409.90 | 13 |
2005-11-15 | Perforation | 405.20 | 406.20 | 13 |
2005-11-15 | Perforation | 313.70 | 314.20 | 13 |
2005-11-15 | Perforation | 301.30 | 301.80 | 13 |
2005-11-15 | Perforation | 289.10 | 289.60 | 13 |
2005-11-15 | Perforation | 285.60 | 286.10 | 13 |
2005-11-15 | Perforation | 281.90 | 282.40 | 13 |
2005-12-09 | Fracture | 281.90 | 599.70 | 0 |
2018-12-19 | Perforation | 418.00 | 420.00 | 13 |
2018-12-19 | Perforation | 423.00 | 426.00 | 13 |
2005-11-15 | Perforation | 583.30 | 583.80 | 13 |
2018-12-19 | Perforation | 477.00 | 479.00 | 13 |
2018-12-19 | Perforation | 646.40 | 647.40 | 13 |
2005-11-15 | Perforation | 578.90 | 579.40 | 13 |
2005-11-15 | Perforation | 543.20 | 543.70 | 13 |
2005-11-15 | Perforation | 538.50 | 539.00 | 13 |
2005-11-15 | Perforation | 531.60 | 532.60 | 13 |
2005-11-15 | Perforation | 524.50 | 525.00 | 13 |
2005-11-15 | Perforation | 520.30 | 521.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 336 | 0.0 | 0.0 | 0.0 |
2006 | 8727 | 0.0 | 0.0 | 0.0 |
2007 | 5831 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-12-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]