If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264242915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.255041,"lon":-113.315333,"icon":""}]} |
Location: 00/15-29-026-24W4/0 | |
Location Alias: 00/15-29-26-24 W4M | |
Location Alias 2: 00/15-29-026-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 29 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 15-29-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0415745 | |
License Date: 2009-12-17 | |
License Status: Issued | |
Spud Date: 2010-01-19 | |
Final Drill Date: 2010-01-31 | |
Well Total Depth: 927.00 m | |
Surface Hole Latitude: 51.255041 | |
Surface Hole Longitude: -113.315333 |
Date | Event |
---|---|
2009-12-17 | Obtained License |
2010-01-20 | Surface Casing Operation Performed |
2010-01-31 | Finished Drilling |
2010-01-31 | Production Casing Operation Performed |
2010-01-31 | Rig Released |
2010-01-31 | Well Mode changed to Drilled and Cased |
2010-02-03 | Well Log Performed |
2010-02-24 | Perforation Treatment Performed - Jet Perforation |
2010-03-12 | Well Fluid changed to Gas |
2010-03-12 | Well Mode changed to Testing |
2010-05-24 | Perforation Treatment Performed - Fractured |
2010-06-03 | Well Began Production |
2010-06-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-06-03 | Well Mode changed to Flowing |
2011-10-06 | Perforation Treatment Performed - Jet Perforation |
2011-10-18 | Perforation Treatment Performed - Fractured |
2011-10-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-27 | Well Mode changed to Suspended |
2011-10-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-28 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-24 | Perforation | 856.00 | 857.00 | 13 |
2010-05-24 | Fracture | 586.00 | 589.00 | 0 |
2011-10-06 | Perforation | 179.00 | 182.00 | 13 |
2011-10-06 | Perforation | 186.00 | 188.00 | 13 |
2011-10-06 | Perforation | 190.00 | 192.00 | 13 |
2011-10-06 | Perforation | 216.00 | 218.00 | 13 |
2011-10-06 | Perforation | 223.00 | 225.00 | 13 |
2011-10-06 | Perforation | 248.30 | 248.80 | 13 |
2011-10-06 | Perforation | 258.40 | 258.90 | 13 |
2011-10-06 | Perforation | 261.30 | 261.80 | 13 |
2011-10-06 | Perforation | 268.30 | 268.80 | 13 |
2010-02-24 | Perforation | 843.00 | 845.00 | 13 |
2011-10-06 | Perforation | 285.00 | 286.00 | 13 |
2011-10-06 | Perforation | 327.00 | 330.00 | 13 |
2011-10-06 | Perforation | 341.00 | 343.00 | 13 |
2011-10-06 | Perforation | 365.20 | 365.70 | 13 |
2011-10-06 | Perforation | 366.60 | 367.10 | 13 |
2011-10-06 | Perforation | 370.10 | 370.60 | 13 |
2011-10-06 | Perforation | 385.50 | 386.50 | 13 |
2011-10-06 | Perforation | 388.80 | 389.80 | 13 |
2011-10-06 | Perforation | 390.70 | 391.20 | 13 |
2011-10-06 | Perforation | 401.30 | 401.80 | 13 |
2010-02-24 | Perforation | 819.00 | 822.00 | 13 |
2011-10-06 | Perforation | 408.60 | 409.10 | 13 |
2011-10-06 | Perforation | 412.60 | 413.60 | 13 |
2011-10-06 | Perforation | 415.00 | 415.50 | 13 |
2011-10-06 | Perforation | 420.00 | 423.00 | 13 |
2011-10-06 | Perforation | 427.50 | 428.50 | 13 |
2011-10-06 | Perforation | 429.60 | 430.60 | 13 |
2011-10-06 | Perforation | 467.00 | 470.00 | 13 |
2011-10-06 | Perforation | 474.10 | 474.60 | 13 |
2011-10-06 | Perforation | 480.40 | 481.40 | 13 |
2011-10-06 | Perforation | 483.60 | 484.10 | 13 |
2010-02-24 | Perforation | 793.00 | 794.00 | 13 |
2011-10-06 | Perforation | 491.40 | 492.40 | 13 |
2011-10-06 | Perforation | 499.40 | 499.90 | 13 |
2011-10-06 | Perforation | 506.00 | 506.50 | 13 |
2011-10-06 | Perforation | 507.00 | 507.50 | 13 |
2011-10-06 | Perforation | 523.00 | 525.00 | 13 |
2011-10-06 | Perforation | 538.70 | 539.20 | 13 |
2011-10-18 | Fracture | 216.00 | 539.20 | 0 |
2010-02-24 | Perforation | 730.50 | 732.50 | 13 |
2010-02-24 | Perforation | 680.00 | 683.00 | 13 |
2010-02-24 | Perforation | 586.00 | 589.00 | 13 |
2010-02-24 | Perforation | 379.00 | 382.00 | 13 |
2010-05-24 | Fracture | 843.00 | 845.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 5112 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8602 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]