If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264242807002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.24629,"lon":-113.295034,"icon":""}]} |
Location: 00/07-28-026-24W4/2 | |
Location Alias: 00/07-28-26-24 W4M | |
Location Alias 2: 00/07-28-026-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 28 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 7-28-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412621 | |
License Date: 2009-09-25 | |
License Status: Issued | |
Spud Date: 2010-01-20 | |
Final Drill Date: 2010-02-01 | |
Well Total Depth: 941.00 m | |
Surface Hole Latitude: 51.246290 | |
Surface Hole Longitude: -113.295034 |
Date | Event |
---|---|
2009-09-25 | Obtained License |
2010-01-21 | Surface Casing Operation Performed |
2010-02-01 | Finished Drilling |
2010-02-01 | Production Casing Operation Performed |
2010-02-01 | Well Log Performed |
2010-02-01 | Well Mode changed to Drilled and Cased |
2010-02-02 | Rig Released |
2010-02-05 | Well Log Performed |
2010-02-20 | Perforation Treatment Performed - Jet Perforation |
2010-03-01 | Perforation Treatment Performed - Fractured |
2010-05-17 | Perforation Treatment Performed - Jet Perforation |
2010-07-10 | Perforation Treatment Performed - Fractured |
2010-07-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-07-13 | Well Mode changed to Testing |
2010-09-01 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2010-09-03 | Well Began Production |
2010-09-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-03 | Well Mode changed to Flowing |
2011-10-05 | Perforation Treatment Performed - Jet Perforation |
2011-10-15 | Perforation Treatment Performed - Fractured |
2011-10-20 | Well Fluid changed to Coalbed Methane-Coals Only |
2011-10-20 | Well Mode changed to Suspended |
2011-10-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-21 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-20 | Perforation | 851.80 | 852.30 | 13 |
2010-05-17 | Perforation | 700.00 | 701.00 | 13 |
2010-05-17 | Perforation | 689.00 | 691.00 | 13 |
2010-05-17 | Perforation | 672.00 | 673.00 | 13 |
2010-05-17 | Perforation | 484.00 | 487.00 | 13 |
2010-07-10 | Fracture | 864.00 | 865.00 | 0 |
2010-07-10 | Fracture | 766.00 | 768.00 | 0 |
2010-07-10 | Fracture | 700.00 | 701.00 | 0 |
2010-07-10 | Fracture | 672.00 | 673.00 | 0 |
2010-09-01 | Casing Patch | 851.80 | 852.30 | 0 |
2011-10-05 | Perforation | 260.80 | 261.30 | 13 |
2010-03-01 | Fracture | 851.80 | 852.30 | 0 |
2011-10-05 | Perforation | 270.30 | 270.80 | 13 |
2011-10-05 | Perforation | 272.80 | 273.30 | 13 |
2011-10-05 | Perforation | 281.80 | 282.30 | 13 |
2011-10-05 | Perforation | 286.10 | 286.60 | 13 |
2011-10-05 | Perforation | 307.00 | 310.00 | 13 |
2011-10-05 | Perforation | 379.90 | 381.90 | 13 |
2011-10-05 | Perforation | 387.20 | 387.70 | 13 |
2011-10-05 | Perforation | 395.60 | 396.60 | 13 |
2011-10-05 | Perforation | 399.10 | 400.10 | 13 |
2011-10-05 | Perforation | 401.30 | 401.80 | 13 |
2010-05-17 | Perforation | 864.00 | 865.00 | 13 |
2011-10-05 | Perforation | 423.20 | 423.70 | 13 |
2011-10-05 | Perforation | 427.40 | 428.40 | 13 |
2011-10-05 | Perforation | 438.50 | 441.50 | 13 |
2011-10-05 | Perforation | 490.40 | 490.90 | 13 |
2011-10-05 | Perforation | 497.70 | 498.70 | 13 |
2011-10-05 | Perforation | 501.30 | 502.30 | 13 |
2011-10-05 | Perforation | 509.90 | 510.90 | 13 |
2011-10-05 | Perforation | 517.10 | 518.10 | 13 |
2011-10-05 | Perforation | 523.30 | 523.80 | 13 |
2011-10-05 | Perforation | 524.40 | 524.90 | 13 |
2010-05-17 | Perforation | 847.00 | 848.00 | 13 |
2011-10-05 | Perforation | 555.80 | 556.30 | 13 |
2011-10-05 | Perforation | 559.90 | 560.40 | 13 |
2011-10-05 | Perforation | 565.80 | 566.30 | 13 |
2011-10-15 | Fracture | 260.80 | 566.30 | 0 |
2010-05-17 | Perforation | 833.00 | 834.00 | 13 |
2010-05-17 | Perforation | 826.00 | 828.00 | 13 |
2010-05-17 | Perforation | 766.00 | 768.00 | 13 |
2010-05-17 | Perforation | 751.00 | 752.00 | 13 |
2010-05-17 | Perforation | 723.00 | 725.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2884 | 0.0 | 0.0 | 0.0 |
2011 | 8753 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8712 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8602 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8721 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[5]