X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264242801005

Well Details

Well ID: 0264242801005
Loading map...
Location: 00/01-28-026-24W4/5
Location Alias: 00/01-28-26-24 W4M
Location Alias 2: 00/01-28-026-24 W4/05
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 28
County/Municipality: Wheatland County
Well Name: EMBER 1A ENTICE 1-28-26-24
Operator Name: Ember Resources Inc.
License Number: 0204604
License Date: 1997-08-07
License Status: Issued
Spud Date: 1997-09-02
Final Drill Date: 1997-09-03
Well Total Depth: 960.00 m
Surface Hole Latitude: 51.242107
Surface Hole Longitude: -113.286547

For data sources see[1][2]

Well History

Date Event
1997-08-07 Obtained License
1997-09-03 Finished Drilling
1997-09-03 Production Casing Operation Performed
1997-09-03 Rig Released
1997-09-03 Well Mode changed to Drilled and Cased
1997-10-06 Well Log Performed
1999-09-13 Perforation Treatment Performed - Jet Perforation
1999-09-30 Perforation Treatment Performed - Fractured
2001-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-15 Perforation Treatment Performed - Jet Perforation
2001-09-15 Plug Back Performed
2001-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-19 Plug Back Performed
2001-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-05 Perforation Treatment Performed - Jet Perforation
2001-10-05 Plug Back Performed
2001-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-19 Perforation Treatment Performed - Jet Perforation
2001-11-19 Plug Back Performed
2004-08-21 Perforation Treatment Performed - Jet Perforation
2004-10-14 Perforation Treatment Performed - Jet Perforation
2004-10-29 Perforation Treatment Performed - Fractured
2004-11-08 Perforation Treatment Performed - Jet Perforation
2004-11-23 Well Began Production
2004-11-23 Well Fluid changed to Gas
2004-11-23 Well Mode changed to Flowing
2008-07-29 Perforation Treatment Performed - Jet Perforation
2008-08-06 Perforation Treatment Performed - Fractured
2008-08-13 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-13 Perforation 864.00 867.00 7
2001-11-19 Packing Device Capped w/Cement 617.00 620.00 0
2001-11-19 Perforation 610.50 613.50 7
2001-11-19 Perforation 603.00 606.00 7
2004-08-21 Perforation 545.00 549.00 13
2004-10-14 Perforation 490.00 493.00 14
2004-10-29 Fracture 490.00 493.00 0
2004-11-08 Perforation 451.00 454.00 14
2008-07-29 Perforation 323.00 325.00 13
2008-07-29 Perforation 583.60 584.10 13
2008-07-29 Perforation 572.40 572.90 13
1999-09-13 Perforation 871.00 874.00 7
2008-07-29 Perforation 568.70 569.20 13
2008-07-29 Perforation 528.00 530.00 13
2008-07-29 Perforation 523.30 524.30 13
2008-07-29 Perforation 516.00 517.00 13
2008-07-29 Perforation 509.10 510.10 13
2008-07-29 Perforation 505.10 506.10 13
2008-07-29 Perforation 497.80 498.30 13
2008-07-29 Perforation 448.30 448.80 13
2008-07-29 Perforation 442.90 443.40 13
2008-07-29 Perforation 429.50 430.50 13
1999-09-30 Fracture 864.00 874.00 0
2008-07-29 Perforation 407.90 408.90 13
2008-07-29 Perforation 405.80 406.80 13
2008-07-29 Perforation 402.90 403.90 13
2008-07-29 Perforation 395.90 396.40 13
2008-07-29 Perforation 391.00 391.50 13
2008-07-29 Perforation 389.90 390.40 13
2008-07-29 Perforation 291.20 291.70 13
2008-07-29 Perforation 281.40 281.90 13
2008-07-29 Perforation 278.80 279.30 13
2008-07-29 Perforation 275.40 275.90 13
2001-09-15 Packing Device Capped w/Cement 846.00 854.00 0
2008-07-29 Perforation 274.30 274.80 13
2008-07-29 Perforation 270.80 271.30 13
2008-08-06 Fracture 323.00 325.00 0
2008-08-06 Fracture 270.80 584.10 0
2001-09-15 Perforation 731.00 734.00 11
2001-09-15 Perforation 680.00 682.00 11
2001-09-19 Packing Device Capped w/Cement 714.00 722.00 0
2001-10-05 Packing Device Capped w/Cement 666.00 674.00 0
2001-10-05 Perforation 624.00 627.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 920 0.0 0.0 0.0
2005 8602 0.0 0.0 0.0
2006 8739 0.0 0.0 0.0
2007 8446 0.0 0.0 0.0
2008 5111 0.0 0.0 0.0

For data sources see[5]

References