X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264242516000

Well Details

Well ID: 0264242516000
Loading map...
Location: 00/16-25-026-24W4/0
Location Alias: 00/16-25-26-24 W4M
Location Alias 2: 00/16-25-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 25
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-25-26-24
Operator Name: Ember Resources Inc.
License Number: 0396205
License Date: 2008-04-30
License Status: Issued
Spud Date: 2008-12-08
Final Drill Date: 2008-12-09
Well Total Depth: 928.00 m
Surface Hole Latitude: 51.254344
Surface Hole Longitude: -113.228604

For data sources see[1][2]

Well History

Date Event
2008-04-30 Obtained License
2008-12-08 Surface Casing Operation Performed
2008-12-09 Direction Drilling Operation Performed - Deviate
2008-12-09 Finished Drilling
2008-12-09 Production Casing Operation Performed
2008-12-09 Rig Released
2008-12-09 Well Mode changed to Drilled and Cased
2008-12-17 Well Log Performed
2008-12-19 Well Log Performed
2009-02-02 Perforation Treatment Performed - Jet Perforation
2009-02-07 Perforation Treatment Performed - Fractured
2009-03-18 Well Began Production
2009-03-18 Well Fluid changed to Coalbed Methane-Coals Only
2009-03-18 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-12-09 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-02 Perforation 753.90 754.40 13
2009-02-02 Perforation 649.30 650.30 13
2009-02-02 Perforation 580.60 581.60 13
2009-02-02 Perforation 574.40 576.40 13
2009-02-02 Perforation 548.20 548.70 13
2009-02-02 Perforation 541.50 542.50 13
2009-02-02 Perforation 523.50 525.50 13
2009-02-02 Perforation 515.70 517.70 13
2009-02-02 Perforation 501.60 502.10 13
2009-02-02 Perforation 494.60 495.60 13
2009-02-02 Perforation 491.70 492.20 13
2009-02-02 Perforation 747.60 748.10 13
2009-02-02 Perforation 359.00 361.00 13
2009-02-02 Perforation 340.40 340.90 13
2009-02-02 Perforation 334.80 335.30 13
2009-02-07 Fracture 334.80 754.40 0
2009-02-02 Perforation 742.80 743.30 13
2009-02-02 Perforation 696.30 698.30 13
2009-02-02 Perforation 694.60 695.10 13
2009-02-02 Perforation 688.40 688.90 13
2009-02-02 Perforation 676.20 678.20 13
2009-02-02 Perforation 665.80 666.80 13
2009-02-02 Perforation 659.60 661.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6936 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 8498 0.0 0.0 0.0
2013 8565 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8708 0.0 0.0 0.0
2016 8734 0.0 0.0 0.0
2017 8658 0.0 0.0 0.0
2018 8696 0.0 0.0 0.0
2019 6518 0.0 0.0 0.0
2020 60 0.0 0.0 0.0

For data sources see[6]

References