X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264242210000

Well Details

Well ID: 0264242210000
Loading map...
Location: 00/10-22-026-24W4/0
Location Alias: 00/10-22-26-24 W4M
Location Alias 2: 00/10-22-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 22
County/Municipality: Wheatland County
Well Name: PCP GAYFORD 10-22-26-24
Operator Name: Ovintiv Canada ULC
License Number: 0073298
License Date: 1978-12-04
License Status: RecCertified
Spud Date: 1979-02-27
Final Drill Date: 1979-03-05
Well Total Depth: 881.00 m
Surface Hole Latitude: 51.236722
Surface Hole Longitude: -113.269393

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-04 Obtained License
1979-02-27 Lost Circulation Occurred
1979-02-28 Lost Circulation Occurred
1979-03-05 Finished Drilling
1979-03-06 Production Casing Operation Performed
1979-06-15 Perforation Treatment Performed - Jet Perforation
1979-06-18 Perforation Treatment Performed - Fractured
1979-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-02 Perforation Treatment Performed - Jet Perforation
1979-08-09 Perforation Treatment Performed - Fractured
1979-10-17 Well Mode changed to Drilled and Cased
1993-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-05 Plug Back Performed
1993-08-05 Well Log Performed
1993-08-06 Perforation Treatment Performed - Jet Perforation
1993-08-06 Well Log Performed
1993-08-07 Perforation Treatment Performed - Remedial Casing
1993-08-07 Well Mode changed to Abandoned
1993-12-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-15 Perforation 867.00 869.50 10
1979-06-18 Fracture 867.00 869.50 0
1979-08-01 Packing Device Capped w/Cement 814.50 814.50 0
1979-08-02 Perforation 775.00 779.00 10
1979-08-09 Fracture 775.00 779.00 0
1993-08-05 Packing Device Capped w/Cement 762.00 770.00 0
1993-08-06 Perforation 229.00 229.50 13
1993-08-07 Remedial Casing Cementing 229.00 229.50 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-02-27 Lost Circulation 12.00 12.00
1979-02-28 Lost Circulation 85.00 85.00

For data sources see[5]

References