X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264241607000

Well Details

Well ID: 0264241607000
Loading map...
Location: 00/07-16-026-24W4/0
Location Alias: 00/07-16-26-24 W4M
Location Alias 2: 00/07-16-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 16
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 7-16-26-24
Operator Name: Ember Resources Inc.
License Number: 0414995
License Date: 2009-12-01
License Status: Issued
Spud Date: 2010-02-22
Final Drill Date: 2010-02-25
Well Total Depth: 931.00 m
Surface Hole Latitude: 51.216143
Surface Hole Longitude: -113.294027

For data sources see[1][2]

Well History

Date Event
2009-12-01 Obtained License
2010-02-22 Lost Circulation Occurred
2010-02-22 Surface Casing Operation Performed
2010-02-25 Finished Drilling
2010-02-25 Well Mode changed to Drilled and Cased
2010-02-26 Production Casing Operation Performed
2010-02-26 Rig Released
2010-03-01 Well Log Performed
2010-08-17 Perforation Treatment Performed - Jet Perforation
2010-09-03 Perforation Treatment Performed - Fractured
2010-10-31 Perforation Treatment Performed - Jet Perforation
2010-11-05 Perforation Treatment Performed - Jet Perforation
2010-11-10 Perforation Treatment Performed - Fractured
2010-11-25 Well Began Production
2010-11-25 Well Fluid changed to Coalbed Methane-Coals and Other
2010-11-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-17 Perforation 839.00 840.00 13
2010-10-31 Perforation 460.00 463.00 13
2010-10-31 Perforation 469.80 470.30 13
2010-10-31 Perforation 501.30 502.30 13
2010-10-31 Perforation 546.80 547.30 13
2010-10-31 Perforation 489.70 490.70 13
2010-10-31 Perforation 496.00 497.00 13
2010-11-05 Perforation 243.70 244.70 13
2010-11-05 Perforation 313.30 313.80 13
2010-11-05 Perforation 265.00 265.50 13
2010-11-05 Perforation 256.60 257.10 13
2010-08-17 Perforation 803.00 806.00 13
2010-11-05 Perforation 455.00 458.00 13
2010-11-05 Perforation 417.50 418.50 13
2010-11-05 Perforation 340.50 342.50 13
2010-11-05 Perforation 428.00 430.00 13
2010-11-05 Perforation 437.00 439.00 13
2010-11-05 Perforation 432.00 435.00 13
2010-11-05 Perforation 403.20 403.70 13
2010-11-05 Perforation 400.20 400.70 13
2010-11-05 Perforation 387.30 387.80 13
2010-11-05 Perforation 424.40 425.40 13
2010-08-17 Perforation 779.00 780.00 13
2010-11-05 Perforation 422.60 423.10 13
2010-11-05 Perforation 408.10 409.10 13
2010-11-05 Perforation 363.00 363.50 13
2010-11-05 Perforation 361.60 362.10 13
2010-11-05 Perforation 319.60 320.10 13
2010-11-05 Perforation 385.10 385.60 13
2010-11-05 Perforation 381.20 382.20 13
2010-11-10 Fracture 340.50 463.00 0
2010-11-10 Fracture 243.70 547.30 0
2010-08-17 Perforation 738.00 739.00 13
2010-09-03 Fracture 839.00 840.00 0
2010-09-03 Fracture 803.00 806.00 0
2010-09-03 Fracture 738.00 739.00 0
2010-10-31 Perforation 476.70 477.70 13
2010-10-31 Perforation 482.90 483.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 888 0.0 0.0 0.0
2011 8739 0.0 0.0 0.0
2012 8773 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8723 0.0 0.0 0.0
2016 8709 0.0 0.0 0.0
2017 8678 0.0 0.0 0.0
2018 8660 0.0 0.0 0.0
2019 8485 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-02-22 Lost Circulation 8.00 18.00

For data sources see[6]

References