X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264241002000

Well Details

Well ID: 0264241002000
Loading map...
Location: 00/02-10-026-24W4/0
Location Alias: 00/02-10-26-24 W4M
Location Alias 2: 00/02-10-026-24 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 10
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 2-10-26-24
Operator Name: Ember Resources Inc.
License Number: 0317312
License Date: 2004-10-21
License Status: Issued
Spud Date: 2005-01-26
Final Drill Date: 2005-02-05
Well Total Depth: 636.00 m
Surface Hole Latitude: 51.200528
Surface Hole Longitude: -113.267656

For data sources see[1][2]

Well History

Date Event
2004-10-21 Obtained License
2005-01-26 Surface Casing Operation Performed
2005-02-05 Finished Drilling
2005-02-05 Well Mode changed to Drilled and Cased
2005-02-06 Production Casing Operation Performed
2005-02-06 Rig Released
2005-02-10 Well Log Performed
2005-03-17 Perforation Treatment Performed - Jet Perforation
2006-01-14 Perforation Treatment Performed - Fractured
2006-02-01 Well Began Production
2006-02-01 Well Fluid changed to Coalbed Methane-Coals Only
2006-02-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-17 Perforation 526.90 527.40 13
2005-03-17 Perforation 398.30 398.80 13
2005-03-17 Perforation 388.40 388.90 13
2005-03-17 Perforation 378.50 379.00 13
2005-03-17 Perforation 368.90 369.40 13
2005-03-17 Perforation 361.50 362.00 13
2005-03-17 Perforation 348.90 349.40 13
2005-03-17 Perforation 345.40 345.90 13
2005-03-17 Perforation 291.50 292.50 13
2005-03-17 Perforation 252.90 253.40 13
2005-03-17 Perforation 248.00 248.50 13
2005-03-17 Perforation 520.10 520.60 13
2005-03-17 Perforation 237.60 238.10 13
2005-03-17 Perforation 234.00 234.50 13
2005-03-17 Perforation 228.90 229.40 13
2006-01-14 Fracture 228.90 527.40 0
2005-03-17 Perforation 483.10 483.60 13
2005-03-17 Perforation 480.90 481.40 13
2005-03-17 Perforation 475.40 475.90 13
2005-03-17 Perforation 470.30 470.80 13
2005-03-17 Perforation 461.70 462.20 13
2005-03-17 Perforation 457.70 458.20 13
2005-03-17 Perforation 402.00 403.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7872 0.0 0.0 0.0
2007 7232 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8739 0.0 0.0 0.0
2012 8773 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8724 0.0 0.0 0.0
2016 8728 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 8345 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References