X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264240805002

Well Details

Well ID: 0264240805002
Loading map...
Location: 00/05-08-026-24W4/2
Location Alias: 00/05-08-26-24 W4M
Location Alias 2: 00/05-08-026-24 W4/02
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 24
Section: 08
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-8-26-24
Operator Name: Ember Resources Inc.
License Number: 0335197
License Date: 2005-07-25
License Status: Issued
Spud Date: 2005-10-05
Final Drill Date: 2005-10-11
Well Total Depth: 907.00 m
Surface Hole Latitude: 51.202278
Surface Hole Longitude: -113.326168

For data sources see[1][2]

Well History

Date Event
2005-07-25 Obtained License
2005-10-05 Surface Casing Operation Performed
2005-10-11 Finished Drilling
2005-10-11 Production Casing Operation Performed
2005-10-11 Rig Released
2005-10-11 Well Mode changed to Drilled and Cased
2005-10-15 Well Log Performed
2005-10-27 Perforation Treatment Performed - Jet Perforation
2005-11-15 Perforation Treatment Performed - Jet Perforation
2005-12-28 Perforation Treatment Performed - Jet Perforation
2006-01-07 Perforation Treatment Performed - Fractured
2006-03-25 Well Began Production
2006-03-25 Well Fluid changed to Coalbed Methane-Coals and Other
2006-03-25 Well Mode changed to Flowing
2017-03-09 Well Fluid changed to Coalbed Methane-Coals and Other
2017-03-09 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-27 Perforation 835.00 838.00 13
2005-12-28 Perforation 474.80 475.30 13
2005-12-28 Perforation 469.20 470.20 13
2005-12-28 Perforation 422.40 422.90 13
2005-12-28 Perforation 418.40 418.90 13
2005-12-28 Perforation 416.90 417.40 13
2005-12-28 Perforation 404.90 405.40 13
2005-12-28 Perforation 403.90 404.40 13
2005-12-28 Perforation 398.80 399.30 13
2005-12-28 Perforation 390.90 391.40 13
2005-12-28 Perforation 383.40 383.90 13
2005-11-15 Perforation 819.00 821.00 13
2005-12-28 Perforation 378.80 379.30 13
2005-12-28 Perforation 375.60 376.10 13
2005-12-28 Perforation 373.50 374.00 13
2005-12-28 Perforation 363.70 364.20 13
2005-12-28 Perforation 360.70 361.20 13
2005-12-28 Perforation 356.90 357.40 13
2005-12-28 Perforation 313.00 313.50 13
2005-12-28 Perforation 306.30 306.80 13
2005-12-28 Perforation 298.20 298.70 13
2005-12-28 Perforation 262.90 263.40 13
2005-12-28 Perforation 541.30 541.80 13
2005-12-28 Perforation 257.30 257.80 13
2005-12-28 Perforation 244.30 244.80 13
2005-12-28 Perforation 241.40 241.90 13
2005-12-28 Perforation 235.10 235.60 13
2005-12-28 Perforation 179.30 179.80 13
2006-01-07 Fracture 179.30 541.80 0
2005-12-28 Perforation 533.50 534.00 13
2005-12-28 Perforation 532.40 532.90 13
2005-12-28 Perforation 499.80 500.30 13
2005-12-28 Perforation 493.60 494.10 13
2005-12-28 Perforation 488.70 489.70 13
2005-12-28 Perforation 482.10 482.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6516 0.0 0.0 0.0
2007 7866 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8764 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8731 0.0 0.0 0.0
2016 8686 0.0 0.0 0.0
2017 8540 0.0 0.0 0.0
2018 8704 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

References