If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264240607002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.188541,"lon":-113.339264,"icon":""}]} |
Location: 00/07-06-026-24W4/2 | |
Location Alias: 00/07-06-26-24 W4M | |
Location Alias 2: 00/07-06-026-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 24 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 7-6-26-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0344309 | |
License Date: 2005-12-02 | |
License Status: Issued | |
Spud Date: 2005-12-17 | |
Final Drill Date: 2006-01-04 | |
Well Total Depth: 729.00 m | |
Surface Hole Latitude: 51.188541 | |
Surface Hole Longitude: -113.339264 |
Date | Event |
---|---|
2005-12-02 | Obtained License |
2005-12-17 | Surface Casing Operation Performed |
2006-01-04 | Finished Drilling |
2006-01-04 | Production Casing Operation Performed |
2006-01-04 | Well Mode changed to Drilled and Cased |
2006-01-05 | Rig Released |
2006-01-08 | Well Log Performed |
2006-01-28 | Perforation Treatment Performed - Jet Perforation |
2006-02-16 | Perforation Treatment Performed - Fractured |
2006-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-05 | Plug Back Performed |
2006-12-04 | Perforation Treatment Performed - Jet Perforation |
2006-12-14 | Perforation Treatment Performed - Fractured |
2007-01-05 | Well Began Production |
2007-01-05 | Well Fluid changed to Coalbed Methane-Coals Only |
2007-01-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-28 | Perforation | 604.50 | 606.50 | 13 |
2006-12-04 | Perforation | 486.80 | 487.80 | 13 |
2006-12-04 | Perforation | 477.40 | 478.40 | 13 |
2006-12-04 | Perforation | 469.50 | 470.00 | 13 |
2006-12-04 | Perforation | 464.10 | 465.10 | 13 |
2006-12-04 | Perforation | 456.00 | 456.50 | 13 |
2006-12-04 | Perforation | 417.60 | 418.10 | 13 |
2006-12-04 | Perforation | 411.60 | 414.60 | 13 |
2006-12-04 | Perforation | 408.50 | 409.00 | 13 |
2006-12-04 | Perforation | 397.80 | 398.30 | 13 |
2006-12-04 | Perforation | 395.50 | 396.00 | 13 |
2006-02-16 | Fracture | 604.50 | 606.50 | 0 |
2006-12-04 | Perforation | 391.90 | 392.40 | 13 |
2006-12-04 | Perforation | 384.90 | 385.40 | 13 |
2006-12-04 | Perforation | 376.50 | 377.50 | 13 |
2006-12-04 | Perforation | 375.40 | 375.90 | 13 |
2006-12-04 | Perforation | 373.20 | 373.70 | 13 |
2006-12-04 | Perforation | 370.30 | 370.80 | 13 |
2006-12-04 | Perforation | 367.70 | 368.70 | 13 |
2006-12-04 | Perforation | 358.20 | 358.70 | 13 |
2006-12-04 | Perforation | 350.80 | 351.30 | 13 |
2006-12-04 | Perforation | 335.30 | 335.80 | 13 |
2006-10-05 | Packing Device Capped w/Cement | 591.50 | 599.50 | 0 |
2006-12-04 | Perforation | 333.40 | 333.90 | 13 |
2006-12-04 | Perforation | 332.50 | 333.00 | 13 |
2006-12-04 | Perforation | 301.50 | 302.00 | 13 |
2006-12-04 | Perforation | 297.50 | 298.00 | 13 |
2006-12-04 | Perforation | 290.90 | 291.40 | 13 |
2006-12-04 | Perforation | 272.00 | 272.50 | 13 |
2006-12-04 | Perforation | 258.00 | 258.50 | 13 |
2006-12-04 | Perforation | 240.20 | 240.70 | 13 |
2006-12-04 | Perforation | 237.80 | 238.30 | 13 |
2006-12-04 | Perforation | 232.60 | 233.10 | 13 |
2006-12-04 | Perforation | 550.20 | 550.70 | 13 |
2006-12-04 | Perforation | 230.90 | 231.40 | 13 |
2006-12-04 | Perforation | 221.20 | 221.70 | 13 |
2006-12-14 | Fracture | 221.20 | 550.70 | 0 |
2006-12-04 | Perforation | 541.50 | 542.00 | 13 |
2006-12-04 | Perforation | 536.80 | 537.30 | 13 |
2006-12-04 | Perforation | 529.80 | 530.30 | 13 |
2006-12-04 | Perforation | 494.10 | 494.60 | 13 |
2006-12-04 | Perforation | 491.80 | 492.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 7930 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8718 | 0.0 | 0.0 | 0.0 |
2012 | 8764 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8736 | 0.0 | 0.0 | 0.0 |
2015 | 8731 | 0.0 | 0.0 | 0.0 |
2016 | 8710 | 0.0 | 0.0 | 0.0 |
2017 | 8540 | 0.0 | 0.0 | 0.0 |
2018 | 8704 | 0.0 | 0.0 | 0.0 |
2019 | 8745 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]