X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264231516000

Well Details

Well ID: 0264231516000
Loading map...
Location: 00/16-15-026-23W4/0
Location Alias: 00/16-15-26-23 W4M
Location Alias 2: 00/16-15-026-23 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 23
Section: 15
County/Municipality: Wheatland County
Well Name: EMBER ROCKYFRD 16-15-26-23
Operator Name: Ember Resources Inc.
License Number: 0108252
License Date: 1984-07-17
License Status: Issued
Spud Date: 1984-08-18
Final Drill Date: 1984-08-25
Well Total Depth: 1547.00 m
Surface Hole Latitude: 51.226629
Surface Hole Longitude: -113.124669

For data sources see[1][2]

Well History

Date Event
1984-07-17 Obtained License
1984-08-19 Surface Casing Operation Performed
1984-08-25 Finished Drilling
1984-08-25 Well Mode changed to Drilled and Cased
1984-08-26 Well Log Performed
1984-08-27 Drill Stem Test Performed
1984-08-27 Well Log Performed
1984-08-28 Drill Stem Test Performed
1984-08-29 Drill Stem Test Performed
1984-08-30 Production Casing Operation Performed
1984-08-30 Rig Released
1984-10-29 Well Log Performed
1984-11-03 Perforation Treatment Performed - Jet Perforation
1984-11-03 Well Log Performed
1984-11-06 Perforation Treatment Performed - Fractured
1984-11-13 Perforation Treatment Performed - Jet Perforation
1984-11-13 Well Log Performed
1984-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-16 Plug Back Performed
1984-11-16 Well Log Performed
1995-05-20 Well Log Performed
1995-05-21 Perforation Treatment Performed - Jet Perforation
1995-05-23 Well Log Performed
1995-05-24 Perforation Treatment Performed - Jet Perforation
1995-05-24 Well Log Performed
1996-08-30 Well Began Production
1996-08-30 Well Fluid changed to Gas
1996-08-30 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-03 Perforation 1522.00 1526.00 13
1984-11-03 Perforation 1528.00 1529.00 13
1984-11-06 Fracture 1522.00 1529.00 0
1984-11-13 Perforation 1522.00 1526.00 13
1984-11-13 Perforation 1528.00 1529.00 13
1984-11-16 Packing Device Capped w/Cement 1511.00 1520.00 0
1995-05-21 Perforation 688.00 693.00 20
1995-05-24 Perforation 660.00 663.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 24 0.0 0.0 0.0
1996 2552 0.0 0.0 0.0
1997 8497 0.0 0.0 0.0
1998 8568 0.0 0.0 0.0
1999 8620 0.0 0.0 0.0
2000 8057 0.0 0.0 0.0
2001 8183 0.0 0.0 0.0
2002 8212 0.0 0.0 0.0
2003 8466 0.0 0.0 0.0
2004 8572 0.0 0.0 0.0
2005 7687 0.0 0.0 0.0
2006 8709 0.0 0.0 0.0
2007 8270 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8740 0.0 0.0 0.0
2012 8502 0.0 0.0 0.0
2013 8748 0.0 0.0 0.0
2014 8688 0.0 0.0 0.0
2015 8684 0.0 0.0 0.0
2016 2171 0.0 0.0 0.0
2017 6492 0.0 0.0 0.0
2018 3427 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References