If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264130209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.192531,"lon":-111.705682,"icon":""}]} |
Location: 00/09-02-026-13W4/0 | |
Location Alias: 00/09-02-26-13 W4M | |
Location Alias 2: 00/09-02-026-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 13 | |
Section: 02 | |
County/Municipality: Special Areas No. 2 | |
Well Name: RENAISSANCE CESSFORD 9-2-26-13 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0006773 | |
License Date: 1953-07-20 | |
License Status: RecCertified | |
Spud Date: 1953-07-24 | |
Final Drill Date: 1953-08-08 | |
Well Total Depth: 1054.60 m | |
Surface Hole Latitude: 51.192531 | |
Surface Hole Longitude: -111.705682 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-07-20 | Obtained License |
1953-07-31 | Drill Stem Test Performed |
1953-08-01 | Drill Stem Test Performed |
1953-08-04 | Drill Stem Test Performed |
1953-08-06 | Drill Stem Test Performed |
1953-08-08 | Finished Drilling |
1953-08-08 | Well Mode changed to Drilled and Cased |
1953-08-09 | Production Casing Operation Performed |
1953-08-17 | Perforation Treatment Performed - Jet Perforation |
1953-09-07 | Well Began Production |
1953-09-07 | Well Fluid changed to Crude Oil |
1953-09-07 | Well Mode changed to Flowing |
1954-06-24 | Well Fluid changed to Crude Oil |
1954-06-24 | Well Mode changed to Suspended |
1958-08-05 | Well Fluid changed to Crude Oil |
1958-08-05 | Well Mode changed to Flowing |
1960-02-12 | Well Fluid changed to Crude Oil |
1960-02-12 | Well Mode changed to Suspended |
1960-04-06 | Well Fluid changed to Crude Oil |
1960-04-06 | Well Mode changed to Flowing |
1962-04-04 | Well Fluid changed to Crude Oil |
1962-04-04 | Well Mode changed to Suspended |
1962-06-25 | Well Fluid changed to Crude Oil |
1962-06-25 | Well Mode changed to Flowing |
1980-02-01 | Well Fluid changed to Crude Oil |
1980-02-01 | Well Mode changed to Suspended |
1993-05-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-17 | Plug Back Performed |
1993-05-17 | Well Fluid changed to Crude Oil |
1993-05-17 | Well Mode changed to Abandoned Zone |
1999-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-21 | Perforation Treatment Performed - Jet Perforation |
1999-10-21 | Perforation Treatment Performed - Remedial Casing |
1999-10-21 | Plug Back Performed |
1999-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-22 | Perforation Treatment Performed - Jet Perforation |
1999-10-22 | Perforation Treatment Performed - Remedial Casing |
1999-10-25 | Well Abandoned |
1999-10-25 | Well Fluid changed to Crude Oil |
1999-10-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-08-17 | Perforation | 1029.90 | 1031.70 | 10 |
1999-10-22 | Perforation | 250.00 | 251.00 | 13 |
1999-10-22 | Remedial Casing Cementing | 250.00 | 251.00 | 0 |
1999-10-22 | Packing Device Capped w/Cement | 237.00 | 253.00 | 0 |
1993-05-17 | Packing Device Capped w/Cement | 1016.00 | 1024.00 | 0 |
1999-10-21 | Perforation | 810.00 | 811.00 | 13 |
1999-10-21 | Packing Device Capped w/Cement | 797.00 | 813.00 | 0 |
1999-10-21 | Perforation | 763.00 | 764.00 | 13 |
1999-10-21 | Packing Device Capped w/Cement | 750.00 | 766.00 | 0 |
1999-10-21 | Perforation | 375.00 | 376.00 | 13 |
1999-10-21 | Remedial Casing Cementing | 375.00 | 376.00 | 0 |
1999-10-21 | Packing Device Capped w/Cement | 338.00 | 378.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1392 | 0.0 | 0.0 | 0.0 |
1969 | 5520 | 0.0 | 0.0 | 0.0 |
1970 | 6110 | 0.0 | 0.0 | 0.0 |
1971 | 6127 | 0.0 | 0.0 | 0.0 |
1972 | 6411 | 0.0 | 0.0 | 0.0 |
1973 | 2170 | 0.0 | 0.0 | 0.0 |
1974 | 7635 | 0.0 | 0.0 | 0.0 |
1975 | 8673 | 0.0 | 0.0 | 0.0 |
1976 | 8637 | 0.0 | 0.0 | 0.0 |
1977 | 8442 | 0.0 | 0.0 | 0.0 |
1978 | 8671 | 0.0 | 0.0 | 0.0 |
1979 | 5697 | 0.0 | 0.0 | 0.0 |
1980 | 360 | 0.0 | 0.0 | 0.0 |
For data sources see[5]